Accelerated Life Estimation of XLPE Model Cable for Power Transmission by the Time Dependent Cumulative Stress Level

被引:0
|
作者
Eom, Ju-Hong [1 ]
Ko, Hyeon-Sang [1 ]
Choi, Tae-Ho [1 ]
Kang, Ji-Won [1 ]
机构
[1] Kepco, Naju Si, South Korea
关键词
XLPE cable; Life Estimation; Asset management; Accelerated life; Cumulative Stress; Power Transmission;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
As far as investment cost is concerned, a cable is a very representative power transmission system that is included in the asset management by priority. Of them, XLPE cable, which was introduced to Korea in 1980, has been on the increase since 1995. As XLPE cables whose design life gets close to 30 years (expiration period) increased gradually in quantity as of 2022, it has come a time to draw up a plan for economically favored operation and replacement through systematic history management and quantitative status diagnosis. To draw a bathtub curve that KEPCO uses to diagnose the status of cables, we planned a test on the lifetime of the XLPE model cable by accelerated degradation and proposed a new method of estimating the life in a short time through an empirical study.
引用
收藏
页码:601 / 605
页数:5
相关论文
共 49 条