Optimal sampling plan for an unreliable multistage production system subject to competing and propagating random shifts

被引:1
|
作者
Obaidat, Sinan [1 ]
Liao, Haitao [1 ]
机构
[1] Univ Arkansas, Dept Ind Engn, Fayetteville, AR 72701 USA
基金
美国国家科学基金会;
关键词
Sampling plan; multistage production systems; competing and propagating random shifts; ECONOMIC-STATISTICAL DESIGNS; MULTIPLE ASSIGNABLE CAUSES; (X)OVER-BAR CONTROL CHART; PERFORMANCE EVALUATION; INTEGRATED MODEL; QUALITY INSPECTION; JOINT OPTIMIZATION; MAINTENANCE; LINES; IMPROVEMENT;
D O I
10.1080/24725854.2020.1825880
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Sampling plans play an important role in monitoring production systems and reducing quality- and maintenance-related costs. Existing sampling plans usually focus on one assignable cause. However, multiple assignable causes may occur, especially for a multistage production system, and the resulting process shift may propagate downstream. This article addresses the problem of finding the optimal sampling plan for an unreliable multistage production system subject to competing and propagating random quality shifts. In particular, a serial production system with two unreliable machines that produce a product at a fixed production rate is studied. It is assumed that both machines are subject to random quality shifts with increased nonconforming rates and can suddenly fail with increasing failure rates. A sampling plan is implemented at the end of the production line to determine whether the system has shifted or not. If a process shift is detected, a necessary maintenance action will be initiated. The optimal sample size, sampling interval, and acceptance threshold are determined by minimizing the long-run cost rate subject to the constraints on average time to signal a true alarm, effective production rate, and system availability. A numerical example on an automatic shot blasting and painting system is provided to illustrate the application of the proposed sampling plan and the effects of key parameters and system constraints on the optimal sampling plan. Moreover, the proposed model shows better performance for various cases than an alternative model that ignores shift propagation.
引用
收藏
页码:1244 / 1265
页数:22
相关论文
共 50 条
  • [41] Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system
    Bouslah, Bassem
    Gharbi, Ali
    Pellerin, Robert
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 144 (01) : 143 - 156
  • [42] Economic lot sizing for an imperfect production system subject to random breakdowns
    Lin, GC
    Kroll, DE
    ENGINEERING OPTIMIZATION, 2006, 38 (01) : 73 - 92
  • [43] OPTIMAL LOT SIZE DETERMINATION OF MULTISTAGE PRODUCTION-ASSEMBLY SYSTEM.
    Klapka, Jindrich L.
    AMSE Review (Association for the Advancement of Modelling and Simulation Techniques in Enterprises, 1986, 4 (01): : 1 - 5
  • [44] Optimal lot sizing for an unreliable production system under partial backlogging and at most two failures in a production cycle
    Giri, BC
    Yun, WY
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2005, 95 (02) : 229 - 243
  • [45] Optimal Production Run Length for Deteriorating Production System in Fuzzy Random Environments
    Ji, Ya-Ping
    Hu, Jin-Song
    Zhou, Yan
    Zhang, Guang-Ming
    Hu, Yue-Ying
    2011 INTERNATIONAL CONFERENCE ON COMPUTERS, COMMUNICATIONS, CONTROL AND AUTOMATION (CCCA 2011), VOL I, 2010, : 241 - 245
  • [46] Optimal Bayesian fault prediction scheme for a partially observable system subject to random failure
    Kim, Michael Jong
    Jiang, Rui
    Makis, Viliam
    Lee, Chi-Guhn
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 214 (02) : 331 - 339
  • [47] Determination of the optimal production run and the optimal initial means of a process with dependent multiple quality characteristics subject to a random deterioration
    K. Tahera
    R. N. Ibrahim
    P. B. Lochert
    The International Journal of Advanced Manufacturing Technology, 2008, 39 : 623 - 632
  • [48] Determination of the optimal production run and the optimal initial means of a process with dependent multiple quality characteristics subject to a random deterioration
    Tahera, K.
    Ibrahim, R. N.
    Lochert, P. B.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 39 (5-6): : 623 - 632
  • [49] Determination of the optimal production run and the optimal initial means of a process with dependent multiple quality characteristics subject to a random deterioration
    Tahera, K.
    Ibrahim, R.N.
    Lochert, P.B.
    International Journal of Advanced Manufacturing Technology, 2008, 39 (5-6): : 623 - 632
  • [50] Joint optimal production planning and proactive maintenance policy for a system subject to degradation
    Wang, Lin
    Lu, Zhiqiang
    Han, Xiaole
    JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2019, 25 (02) : 236 - 252