Optimal sampling plan for an unreliable multistage production system subject to competing and propagating random shifts

被引:1
|
作者
Obaidat, Sinan [1 ]
Liao, Haitao [1 ]
机构
[1] Univ Arkansas, Dept Ind Engn, Fayetteville, AR 72701 USA
基金
美国国家科学基金会;
关键词
Sampling plan; multistage production systems; competing and propagating random shifts; ECONOMIC-STATISTICAL DESIGNS; MULTIPLE ASSIGNABLE CAUSES; (X)OVER-BAR CONTROL CHART; PERFORMANCE EVALUATION; INTEGRATED MODEL; QUALITY INSPECTION; JOINT OPTIMIZATION; MAINTENANCE; LINES; IMPROVEMENT;
D O I
10.1080/24725854.2020.1825880
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Sampling plans play an important role in monitoring production systems and reducing quality- and maintenance-related costs. Existing sampling plans usually focus on one assignable cause. However, multiple assignable causes may occur, especially for a multistage production system, and the resulting process shift may propagate downstream. This article addresses the problem of finding the optimal sampling plan for an unreliable multistage production system subject to competing and propagating random quality shifts. In particular, a serial production system with two unreliable machines that produce a product at a fixed production rate is studied. It is assumed that both machines are subject to random quality shifts with increased nonconforming rates and can suddenly fail with increasing failure rates. A sampling plan is implemented at the end of the production line to determine whether the system has shifted or not. If a process shift is detected, a necessary maintenance action will be initiated. The optimal sample size, sampling interval, and acceptance threshold are determined by minimizing the long-run cost rate subject to the constraints on average time to signal a true alarm, effective production rate, and system availability. A numerical example on an automatic shot blasting and painting system is provided to illustrate the application of the proposed sampling plan and the effects of key parameters and system constraints on the optimal sampling plan. Moreover, the proposed model shows better performance for various cases than an alternative model that ignores shift propagation.
引用
收藏
页码:1244 / 1265
页数:22
相关论文
共 50 条
  • [1] Optimal control of a single stage production system subject to random process shifts
    Nurani, RK
    Seshadri, S
    Shanthikumar, JG
    OPERATIONS RESEARCH, 1997, 45 (05) : 713 - 724
  • [2] Joint Production and Replacement Planning for an Unreliable Manufacturing System Subject to Random Demand and Quality
    Ouaret, Samir
    Kenne, Jean-Pierre
    Gharbi, Ali
    IFAC PAPERSONLINE, 2018, 51 (11): : 951 - 956
  • [3] Optimal production control in a discrete manufacturing system with unreliable machines and random demands
    Feng, YY
    Yan, HM
    IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 2000, 45 (12) : 2280 - 2296
  • [4] Optimal Bayesian sampling plan for censored competing risks data
    Prajapati, Deepak
    Mitra, Sharmishtha
    Kundu, Debasis
    Pal, Ayan
    JOURNAL OF STATISTICAL COMPUTATION AND SIMULATION, 2023, 93 (05) : 775 - 799
  • [5] Optimal Bayesian sampling acceptance plan with random censoring
    Chen, JW
    Choy, STB
    Li, KH
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 155 (03) : 683 - 694
  • [6] Optimal Control for a Multistage Uncertain Random System
    Chen, Xin
    Jin, Ting
    IEEE ACCESS, 2023, 11 : 2105 - 2117
  • [7] Optimal lot sizing with unreliable production system
    Moini, A
    Murthy, DNP
    MATHEMATICAL AND COMPUTER MODELLING, 2000, 31 (10-12) : 245 - 250
  • [8] Optimal control structure of an unreliable manufacturing system with random demands
    Song, DP
    Sun, YX
    PROCEEDINGS OF THE 35TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-4, 1996, : 4552 - 4557
  • [9] Optimal control structure of an unreliable manufacturing system with random demands
    Song, DP
    Sun, YX
    IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1999, 44 (03) : 619 - 622
  • [10] Optimal Sampling for Data Freshness: Unreliable Transmissions With Random Two-Way Delay
    Pan, Jiayu
    Bedewy, Ahmed M.
    Sun, Yin
    Shroff, Ness B.
    IEEE-ACM TRANSACTIONS ON NETWORKING, 2023, 31 (01) : 408 - 420