共 50 条
- [22] Identical machine scheduling to minimize the number of tardy jobs when lot-splitting is allowed Computers and Industrial Engineering, 1997, 33 (1-2): : 277 - 280
- [26] A note on lot scheduling on a single machine to minimize maximum weighted tardiness Journal of Combinatorial Optimization, 2023, 45
- [29] Common due date assignment and single-machine scheduling with release times to minimize the weighted number of tardy jobs Japan Journal of Industrial and Applied Mathematics, 2016, 33 : 239 - 249