Risk assessment for clearing and grading process of a natural gas pipeline project: An extended TOPSIS model with Pythagorean fuzzy sets for prioritizing hazards

被引:72
|
作者
Oz, Nurdan Ece [1 ,4 ]
Mete, Suleyman [2 ]
Serin, Faruk [3 ]
Gul, Muhammet [2 ]
机构
[1] TANAP Nat Gas Transmiss Co, Occupat Hlth & Safety Dept, Balikesir, Turkey
[2] Munzur Univ, Dept Ind Engn, Tunceli, Turkey
[3] Munzur Univ, Dept Comp Engn, Tunceli, Turkey
[4] Munzur Univ, Dept Engn Management, Grad Sch Nat & Appl Sci, Tunceli, Turkey
来源
HUMAN AND ECOLOGICAL RISK ASSESSMENT | 2019年 / 25卷 / 06期
关键词
risk assessment; natural gas pipeline; 2D risk matrix; Pythagorean fuzzy TOPSIS; OCCUPATIONAL-HEALTH; DECISION-MAKING; HYBRID METHOD; SAFETY; MANAGEMENT; CONSTRUCTION; EXTENSION; AHP;
D O I
10.1080/10807039.2018.1495057
中图分类号
X176 [生物多样性保护];
学科分类号
090705 ;
摘要
A natural gas pipeline project is a broad construction system consisting of both offshore and onshore section, which aims to supply the natural gas to one country to another. In such these projects, main focus of the works should cover workplace, environment, health, and safety of workers and employers. To achieve this, a new occupational health and safety (OHS) risk assessment is necessary for reducing the negative effects of emerged risks. In this article, a fuzzy-based risk model is developed for prioritizing primary and residual risk. A two-dimensional (2D) risk matrix method is initially performed and the Pythagorean fuzzy technique for order preference by similarity to ideal solution (PFTOPSIS) method is then used to prioritize previously identified hazards. For the prioritization of primary and residual risks, hazards are assessed against two parameters (probability and severity) of 2D risk matrix. Unlike previous risk assessment studies, PFTOPSIS is applied for the first time. The fuzzy model is applied to a case study for clearing and grading process of a natural gas pipeline project. A sensitivity analysis is also performed on parameter weights in order to validate the model.
引用
收藏
页码:1615 / 1632
页数:18
相关论文
共 23 条
  • [21] Risk assessment of liquefied natural gas storage tank leakage using failure mode and effects analysis with Fermatean fuzzy sets and CoCoSo method
    Yu, Jianxing
    Ding, Hongyu
    Yu, Yang
    Wu, Shibo
    Zeng, Qingze
    Xu, Ya
    APPLIED SOFT COMPUTING, 2024, 154
  • [22] Research on Quantitative Risk Assessment Model and Failure Probability of Oil/Gas Pipeline Based on Dempster-Shafer Evidence and Intuitionistic Fuzzy Theory
    Zhang, Peng
    Zhou, Ying
    Liao, Tao
    PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON QUALITY, RELIABILITY, RISK, MAINTENANCE, AND SAFETY ENGINEERING (QR2MSE), VOLS I-IV, 2013, : 145 - 150
  • [23] Construction-project risk assessment by a new decision model based on De-Novo multi-approaches analysis and hesitant fuzzy sets under uncertainty
    Zolfaghari, S.
    Mousavi, S. Meysam
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2018, 35 (01) : 639 - 649