Energy-Aware Production Scheduling in Flow Shop and Job Shop Environments Using a Multi-Objective Genetic Algorithm

被引:7
|
作者
Vallejos-Cifuentes, Pablo [1 ]
Ramirez-Gomez, Camilo [2 ]
Escudero-Atehortua, Ana [3 ]
Rodriguez Velasquez, Elkin [4 ]
机构
[1] Univ Nacl Colombia, Calle 59 63-20, Medellin 050034, Colombia
[2] Royal Inst Technol KTH, Stockholm, Sweden
[3] Univ Pontificia Bolivariana, Mech Engn, Medellin, Colombia
[4] Univ Nacl Colombia, Dept Engn Management, Bogota, Colombia
关键词
Production Scheduling; Energy Efficiency; Flow Shop; Job Shop; Multi-Objective Optimization; Economics of engineering; Strategic and operation management; Systems engineering; MINIMIZE TARDINESS PENALTY; TOTAL WEIGHTED TARDINESS; POWER-CONSUMPTION; OPTIMIZATION; COST; MAKESPAN; SEARCH;
D O I
10.1080/10429247.2018.1544798
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The energy-aware scheduling problem is a multi-objective optimization problem where the main goal is to achieve energy savings without affecting productivity in a manufacturing system. In this work, we present an approach for energy-aware flow shop scheduling problem and energy-aware job shop scheduling problem considering the process speed as the main energy-related decision variable. This approach allows one to set the appropriate process speed for every considered operation in the corresponding machine. When the speed is high, the processing time is short but the energy demand increases, and vice versa. Therefore, two objectives are worked together: a production objective, paired with an energy efficiency objective. A generic elitist multi-objective genetic algorithm was implemented to solve both problems. Results from a simple comparative design of experiments and a nonparametric test show that it is possible to smooth the energy demand profile and obtain reductions that average 19.8% in energy consumption. This helps to reduce peak loads and drops on applied energy sources demand, stabilizing the conversion units operational efficiency across the entire operational time with a minimum effect on the production maximum completion time (makespan).
引用
收藏
页码:82 / 97
页数:16
相关论文
共 50 条
  • [41] Decomposition-Based Multi-Objective Optimization for Energy-Aware Distributed Hybrid Flow Shop Scheduling with Multiprocessor Tasks
    Jiang, Enda
    Wang, Ling
    Wang, Jingjing
    TSINGHUA SCIENCE AND TECHNOLOGY, 2021, 26 (05) : 646 - 663
  • [42] Optimising the job-shop scheduling problem using a multi-objective Jaya algorithm
    He, Lijun
    Li, Wenfeng
    Chiong, Raymond
    Abedi, Mehdi
    Cao, Yulian
    Zhang, Yu
    APPLIED SOFT COMPUTING, 2021, 111
  • [43] Multi-objective Job Shop Scheduling using a Modified Artificial Bee Colony Algorithm
    Zhang, Hao
    Zhu, Yunlong
    Ku, Tao
    2017 IEEE 7TH ANNUAL INTERNATIONAL CONFERENCE ON CYBER TECHNOLOGY IN AUTOMATION, CONTROL, AND INTELLIGENT SYSTEMS (CYBER), 2017, : 701 - 706
  • [44] Multi-objective flexible job shop scheduling problem using differential evolution algorithm
    Cao, Yang
    Shi, Haibo
    Han, Zhonghua
    2017 9TH INTERNATIONAL CONFERENCE ON MODELLING, IDENTIFICATION AND CONTROL (ICMIC 2017), 2017, : 521 - 526
  • [45] An improved multi-objective genetic algorithm for fuzzy flexible job-shop scheduling problem
    Wang, Xiaojuan
    Li, Wenfeng
    Zhang, Ying
    INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 2013, 47 (2-3) : 280 - 288
  • [46] Efficient Nondominated Sorting with Genetic Algorithm for solving Multi-objective job shop scheduling problems
    Ali, Abdalla
    Birkett, Martin
    Hackney, Phil
    Bell, David
    PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE MULTIDISCIPLINARY ENGINEERING DESIGN OPTIMIZATION (MEDO), 2016,
  • [47] A hybrid genetic algorithm and tabu search for a multi-objective dynamic job shop scheduling problem
    Zhang, Liping
    Gao, Liang
    Li, Xinyu
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (12) : 3516 - 3531
  • [48] Genetic algorithm based multi-objective scheduling in a flow shop with batch processing machines
    Lei, Deming
    Zhang, Qiongfang
    Cheng, Wen
    Wang, Tao
    Guo, Xiuping
    2010 8TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2010, : 694 - 699
  • [49] Approach for Multi-objective Flexible Job shop scheduling
    Hui, Hongjie
    AUTOMATIC MANUFACTURING SYSTEMS II, PTS 1 AND 2, 2012, 542-543 : 407 - 410
  • [50] Study on Job Shop Scheduling Optimization with Multi-objective
    Ze, Tao
    Di, Liang
    Qun, Zhou
    HIGH PERFORMANCE STRUCTURES AND MATERIALS ENGINEERING, PTS 1 AND 2, 2011, 217-218 : 326 - +