Modelling generator maintenance scheduling costs in deregulated power markets

被引:22
|
作者
Dahal, Keshav [1 ]
Al-Arfaj, Khalid [2 ]
Paudyal, Krishna [3 ]
机构
[1] Univ West Scotland, Sch Comp, Paisley PA1 2BE, Renfrew, Scotland
[2] Al Raidah Investment Co, Informat Commun Technol, Riyadh 11564, Saudi Arabia
[3] Univ Strathclyde, Strathclyde Business Sch, Glasgow, Lanark, Scotland
关键词
Maintenance; Opportunity cost; Deregulated market; Reputation; AHP; INTERRUPTION COSTS; ELECTRICITY; SYSTEMS; FAILURES; IMPACT; UNITS;
D O I
10.1016/j.ejor.2014.07.008
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Generating companies use the maintenance cost function as the sole or main objective for creating the maintenance schedule of power generators. Usually only maintenance activities related costs are considered to derive the cost function. However, in deregulated markets, maintenance related costs alone do not represent the full costs of generators. This paper models various cost components that affect the maintenance activities in deregulated power markets. The costs that we model include direct and indirect maintenance, failures, interruptions, contractual compensation, rescheduling, and market opportunity. The loss of firm's reputation and selection of loyalty model are also considered using the Analytic Hierarchy Process (AHP) within an opportunity cost model. A case study is used to illustrate the modelling activities. The enhanced model is utilised in generator maintenance scheduling cases. The experimental results demonstrate the importance and impact of market related costs in maintenance schedules. (C) 2014 Elsevier B.V. All rights reserved.
引用
收藏
页码:551 / 561
页数:11
相关论文
共 50 条
  • [41] GA/SA-based hybrid techniques for the scheduling of generator maintenance in power systems
    Dahal, KP
    Burt, GM
    McDonald, JR
    Galloway, SJ
    PROCEEDINGS OF THE 2000 CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1 AND 2, 2000, : 567 - 574
  • [42] Generator maintenance scheduling in power systems using metaheuristic-based hybrid approaches
    Dahal, Keshav P.
    Chakpitak, Nopasit
    ELECTRIC POWER SYSTEMS RESEARCH, 2007, 77 (07) : 771 - 779
  • [43] MULTIOBJECTIVE PROGRAMMING IN POWER-SYSTEM OPTIMIZATION - NEW APPROACH TO GENERATOR MAINTENANCE SCHEDULING
    KRALJ, B
    RAJAKOVIC, N
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 1994, 16 (04) : 211 - 220
  • [44] Reducing oilfield electrical power costs in a deregulated market
    Denney, D
    JOURNAL OF PETROLEUM TECHNOLOGY, 2002, 54 (03): : 54 - 55
  • [45] A review of recent advances in generator maintenance scheduling
    Ahmad, A
    Kothari, DP
    ELECTRIC MACHINES AND POWER SYSTEMS, 1998, 26 (04): : 373 - 387
  • [46] An improved robust model for generator maintenance scheduling
    Ekpenyong, Uduakobong E.
    Zhang, Jiangfeng
    Xia, Xiaohua
    ELECTRIC POWER SYSTEMS RESEARCH, 2012, 92 : 29 - 36
  • [47] Comparison of DE and PSO for Generator Maintenance Scheduling
    Yare, Y.
    Venayagamoorthy, G. K.
    2008 IEEE SWARM INTELLIGENCE SYMPOSIUM, 2008, : 59 - 66
  • [48] Optimal Hydropower Maintenance Scheduling in Liberalized Markets
    Helseth, Arild
    Fodstad, Marte
    Mo, Birger
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2018, 33 (06) : 6989 - 6998
  • [49] Coordination of Generation Maintenance Scheduling in Electricity Markets
    Wang, Yang
    Kirschen, Daniel S.
    Zhong, Haiwang
    Xia, Qing
    Kang, Chongqing
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2016, 31 (06) : 4565 - 4574
  • [50] Short-term transmission line maintenance scheduling in a deregulated system
    Marwali, MKC
    Shahidehpour, SM
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (03) : 1117 - 1124