SMART-1 from Conception to Moon Impact

被引:6
|
作者
Racca, Giuseppe D. [1 ]
机构
[1] European Space Agcy, European Space Res & Technol Ctr, Sci Projects Dept, NL-2200 AG Noordwijk, Netherlands
关键词
MISSION;
D O I
10.2514/1.36278
中图分类号
V [航空、航天];
学科分类号
08 ; 0825 ;
摘要
This paper provides an overview of the SMART-1 project from cradle to grave: from its conception in 1997, launch on 27 September 2003, moon arrival on 11 November 2004, until its impact on the moon surface on 3 September 2006. It is necessarily kept to a sufficiently high level to contain its length, but it is intended to give enough information to provide the basis for those readers who intend to deepen their knowledge in more focused papers in this journal or in the references provided. At the time of writing, the project has been completed for more than one year and I can see, with some historical perspective, all the events that lead to this globally very successful mission. Obviously, the emphasis given to certain topics now is rather different from what it was when the issue was just discovered, but I believe that the reader is more interested in learning the objective facts and how they actually affected the mission performance.
引用
收藏
页码:993 / 1002
页数:10
相关论文
共 50 条
  • [41] SMART-1 aims at fruitful end
    不详
    ESA BULLETIN-EUROPEAN SPACE AGENCY, 2006, (127) : 84 - 84
  • [42] SMART-1: Development and lessons learnt
    Swedish Space Corporation, Stockholm, Sweden
    不详
    Int. Astro. Fed. Int. Astro. Congr., 1600, (3391-3402):
  • [43] New lunar south polar maps from SMART-1
    不详
    ESA BULLETIN-EUROPEAN SPACE AGENCY, 2008, (134) : 71 - 71
  • [44] SMART-1“轻吻”月女神
    士元
    太空探索, 2006, (11) : 24 - 27
  • [45] Accommodating electric propulsion on SMART-1
    Kugelberg, J
    Bodin, P
    Persson, S
    Rathsman, P
    ACTA ASTRONAUTICA, 2004, 55 (02) : 121 - 130
  • [46] SMART-1: Crash scene investigation
    不详
    ESA BULLETIN-EUROPEAN SPACE AGENCY, 2006, (128) : 92 - 93
  • [47] SMART-1 mission description and development status
    Racca, GD
    Marini, A
    Stagnaro, L
    van Dooren, J
    di Napoli, L
    Foing, BH
    Lumb, R
    Volp, J
    Brinkmann, J
    Grünagel, R
    Estublier, D
    Tremolizzo, E
    McKay, M
    Camino, O
    Schoemaekers, J
    Hechler, M
    Khan, M
    Rathsman, P
    Andersson, G
    Anflo, K
    Berge, S
    Bodin, P
    Edfors, A
    Hussain, A
    Kugelberg, J
    Larsson, N
    Ljung, B
    Meijer, L
    Mörtsell, A
    Nordebäck, T
    Persson, S
    Sjöberg, F
    PLANETARY AND SPACE SCIENCE, 2002, 50 (14-15) : 1323 - 1337
  • [48] Characteristics of the plasma environment for the SMART-1 mission
    Laakso, H
    Foing, B
    PROCEEDINGS OF THE 7TH SPACECRAFT CHARGING TECHNOLOGY CONFERENCE: 2001: A SPACECRAFT CHARGING ODYSSEY, 2001, 476 : 601 - 608
  • [49] Near infrared spectrometry with SIR on SMART-1
    Nathues, A
    Mall, U
    Keller, U
    PROCEEDINGS OF THE FOURTH INTERNATIONAL CONFERENCE ON EXPLORATION AND UTILISATION OF THE MOON, 2000, 462 : 101 - 103
  • [50] SMART-1 Battery Management Electronic (BME)
    Cabezas, JO
    Pedersen, FH
    Rueda, P
    PROCEEDINGS OF THE SIXTH EUROPEAN SPACE POWER CONFERENCE (ESPC), 2002, 502 : 641 - 646