Optimal production run time for an imperfect production inventory system with rework, random breakdowns and inspection costs

被引:24
|
作者
Ozturk, Harun [1 ]
机构
[1] Suleyman Demirel Univ, Fac Econ & Adm Sci, Dept Business Adm, TR-32260 Isparta, Turkey
关键词
Inventory; Production run time; Scrap; Rework; Random breakdowns; Inspection costs;
D O I
10.1007/s12351-018-0439-5
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In real-life manufacturing systems, the presence of defective products in a lot is inevitable. While these products may be just scrapped in the food industry, in high-tech industries where the final product is very expensive, they may be reworked at a cost. A common assumption in the literature is that the inspection time needed to identify defective items is completed when the production process ends. However, the assumption of continuous inspection during production complicates the analysis, making it impractical for most production systems, especially when the production rate is high, and the proportion of defective items is low, making continuous inspection during production very expensive. In addition, such factors as process deterioration or other uncontrollable factors in the production process may interrupt the production of the lot. To address these practical issues, this paper integrates inspection time and the failure of production facilities into an imperfect production inventory model with rework, where the production run time is a decision variable and an inspection process continues even after a production run; the paper demonstrates significant effects on the optimal solutions, with shortages not allowed. Under these assumptions, a mathematical model is derived, and the concavity of the expected total profit function is proved. Optimal policy is obtained by applying the analytic method. Special cases of the model are studied and a numerical example with sensitivity analysis is provided to draw insights. Moreover, this numerical example is used to compare general and special cases.
引用
收藏
页码:167 / 204
页数:38
相关论文
共 50 条
  • [21] Optimal production and inspection strategy of an integrated economic model for imperfect production system
    Lin, Ya-Hui
    Lin, Tse-Chieh
    JOURNAL OF STATISTICS & MANAGEMENT SYSTEMS, 2012, 15 (4-5): : 543 - 559
  • [22] A note on: an optimal batch size for an imperfect production system with quality assurance and rework
    Buscher, Udo
    Rudert, Steffen
    Schwarz, Christian
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (24) : 7063 - 7067
  • [23] On a production-inventory system of deteriorating items subject to random machine breakdowns with a fixed repair time
    Lin, GC
    Gong, DC
    MATHEMATICAL AND COMPUTER MODELLING, 2006, 43 (7-8) : 920 - 932
  • [24] A note on "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns"
    Chiu, Yuan-Shyi Peter
    Ting, Chia-Kuan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 201 (02) : 641 - 643
  • [25] An imperfect multi-product production system with rework
    Taleizadeh, A. A.
    Jalali-Naini, S. Gh
    Wee, H. -M.
    Kuo, T. -C.
    SCIENTIA IRANICA, 2013, 20 (03) : 811 - 823
  • [26] Trade Credit Policies for Supplier, Manufacturer, and Retailer: An Imperfect Production-Inventory System with Rework
    Nigwal, Atmaram
    Khedlekar, Uttam Kumar
    Sharma, Leena
    Gupta, Neelesh
    JOURNAL OF MATHEMATICAL AND FUNDAMENTAL SCIENCES, 2022, 54 (01) : 76 - 108
  • [27] Optimal setting up cost, production run time and reliability for two-stage production system with imperfect processes
    Wu, Junjian
    Wang, Haiyan
    ICIC Express Letters, 2015, 9 (02): : 401 - 408
  • [28] Optimal Production Run Length for Deteriorating Production System in Fuzzy Random Environments
    Ji, Ya-Ping
    Hu, Jin-Song
    Zhou, Yan
    Zhang, Guang-Ming
    Hu, Yue-Ying
    2011 INTERNATIONAL CONFERENCE ON COMPUTERS, COMMUNICATIONS, CONTROL AND AUTOMATION (CCCA 2011), VOL I, 2010, : 241 - 245
  • [29] An optimal production and inspection strategy with preventive maintenance error and rework
    Chen, Yan-Chun
    JOURNAL OF MANUFACTURING SYSTEMS, 2013, 32 (01) : 99 - 106
  • [30] Optimal production run length for products sold with warranty in an imperfect production system with allowable shortages
    Chen, Cheng-Kang
    Lo, Chih-Chung
    MATHEMATICAL AND COMPUTER MODELLING, 2006, 44 (3-4) : 319 - 331