Skew control of a quay container crane

被引:41
|
作者
Quang Hieu Ngo [2 ]
Hong, Keum-Shik [1 ,2 ]
机构
[1] Pusan Natl Univ, Dept CognoMechatron Engn, Pusan 609735, South Korea
[2] Pusan Natl Univ, Sch Mech Engn, Pusan 609735, South Korea
基金
新加坡国家研究基金会;
关键词
Container crane; Control system design; Input shaping control; Skew motion; OVERHEAD CRANE; GANTRY CRANES; FUZZY CONTROL; FEEDBACK; SYSTEMS; FILTER;
D O I
10.1007/s12206-009-1020-1
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
In this paper, the skew control of the load (container) in the quay crane used in the dockside of a container terminal is investigated. The mathematical model of the 3-dimensional (3D) motions of the load is first derived. The container hooked to a spreader is suspended by four ropes in air. When the container is accelerated by the trolley or is disturbed by winds, it will make a rotational motion (trim, list, and skew) as well as a sway motion in the vertical plane. In such a case, the position of the container becomes difficult to control accurately due to the rotational motion even with the sway motion under control. This paper proposes an input shaping technique for the skew control based on the 3D dynamics of the container. The adopted skew control system uses four electric motors to vary the length of the four ropes individually. Simulation results show the effectiveness of the proposed system in controlling the skew motion.
引用
收藏
页码:3332 / 3339
页数:8
相关论文
共 50 条
  • [41] Integrated internal truck, yard crane and quay crane scheduling in a container terminal considering energy consumption
    He, Junliang
    Huan, Youfang
    Yan, Wei
    Wang, Shuaian
    EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (05) : 2464 - 2487
  • [42] A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal
    Moccia, L
    Cordeau, JF
    Gaudioso, M
    Laporte, G
    NAVAL RESEARCH LOGISTICS, 2006, 53 (01) : 45 - 59
  • [43] A quay crane scheduling algorithm considering the workload of yard cranes in a container yard
    Yan Wang
    Kap Hwan Kim
    Journal of Intelligent Manufacturing, 2011, 22 : 459 - 470
  • [44] Modeling the mixed storage strategy for quay crane double cycling in container terminals
    Zhang, Xiaoju
    Zeng, Qingcheng
    Yang, Zhongzhen
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2016, 94 : 171 - 187
  • [45] Model for disruption management of berth allocation & quay crane scheduling in container terminals
    Zeng, Qing-Cheng
    Hu, Xiang-Pei
    Yang, Zhong-Zhen
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2010, 30 (11): : 2026 - 2035
  • [46] An integrated quay crane assignment and scheduling problem with several contractors in container terminals
    Safaeian, M.
    Etebari, F.
    Vahdani, B.
    SCIENTIA IRANICA, 2021, 28 (02) : 1030 - 1048
  • [47] Combined Configuration of Container Terminal Berth and Quay Crane considering Carbon Cost
    Duan, Jianguo
    Liu, Yi
    Zhang, Qinglei
    Qin, Jiyun
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021 (2021)
  • [48] Quay crane scheduling with non-interference constraints in port container terminals
    Lee, Der-Horng
    Wang, Hui Qiu
    Miao, Lixin
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2008, 44 (01) : 124 - 135
  • [49] Ant Colony System for Solving Quay Crane Scheduling Problem in Container Terminal
    Azza, Lajjam
    El Merouani, Mohamed
    Medouri, Adbdellatif
    PROCEEDINGS OF 2014 2ND IEEE INTERNATIONAL CONFERENCE ON LOGISTICS AND OPERATIONS MANAGEMENT (GOL 2014), 2014, : 176 - 180
  • [50] Integrating optimization method for continuous berth and quay crane scheduling in container terminals
    Lu, Z.-Q. (zhiqianglu@tongji.edu.cn), 1600, Shanghai Jiaotong University (47):