共 50 条
- [43] A quay crane scheduling algorithm considering the workload of yard cranes in a container yard Journal of Intelligent Manufacturing, 2011, 22 : 459 - 470
- [45] Model for disruption management of berth allocation & quay crane scheduling in container terminals Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2010, 30 (11): : 2026 - 2035
- [49] Ant Colony System for Solving Quay Crane Scheduling Problem in Container Terminal PROCEEDINGS OF 2014 2ND IEEE INTERNATIONAL CONFERENCE ON LOGISTICS AND OPERATIONS MANAGEMENT (GOL 2014), 2014, : 176 - 180
- [50] Integrating optimization method for continuous berth and quay crane scheduling in container terminals Lu, Z.-Q. (zhiqianglu@tongji.edu.cn), 1600, Shanghai Jiaotong University (47):