Solving a large-scale precedence constrained scheduling problem with elastic jobs using tabu search

被引:6
|
作者
Pedersen, Christian R.
Rasmussen, Rasmus V.
Andersen, Kim A.
机构
[1] Aarhus Univ, Dept Operat Res, DK-8000 Aarhus C, Denmark
[2] Aarhus Sch Business, Dept Accounting Finance & Logist, DK-8210 Aarhus V, Denmark
关键词
large-scale scheduling; elastic jobs; precedence constraints; practical application; tabu search; ALGORITHM; MAKESPAN;
D O I
10.1016/j.cor.2005.08.001
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper presents a solution method for minimizing makespan of a practical large-scale scheduling problem with elastic jobs. The jobs are processed on three servers and restricted by precedence constraints, time windows and capacity limitations. We derive a new method for approximating the server exploitation of the elastic jobs and solve the problem using a tabu search procedure. Finding an initial feasible solution is in general NP-complete, but the tabu search procedure includes a specialized heuristic for solving this problem. The solution method has proven to be very efficient and leads to a significant decrease in makespan compared to the strategy currently implemented. (c) 2005 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2025 / 2042
页数:18
相关论文
共 50 条
  • [1] Towards Solving Large-Scale Precedence Constrained Production Scheduling Problems in Mining
    Kenny, Angus
    Li, Xiaodong
    Ernst, Andreas T.
    Thiruvady, Dhananjay
    PROCEEDINGS OF THE 2017 GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE (GECCO'17), 2017, : 1137 - 1144
  • [2] Solving LP Relaxations of Large-Scale Precedence Constrained Problems
    Bienstock, Daniel
    Zuckerberg, Mark
    INTEGER PROGRAMMING AND COMBINATORIAL OPTIMIZATION, PROCEEDINGS, 2010, 6080 : 1 - +
  • [3] A Tabu-search Algorithm for Scheduling Jobs with Precedence Constraints on Parallel Machines
    Xu, Kailiang
    Fei, Rong
    He, Dahai
    PROCEEDINGS OF THE 2018 13TH IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS (ICIEA 2018), 2018, : 2774 - 2781
  • [4] Solving the Resource Constrained Project Scheduling Problem using the parallel Tabu Search designed for the CUDA platform
    Bukata, Libor
    Sucha, Premysl
    Hanzalek, Zdenek
    JOURNAL OF PARALLEL AND DISTRIBUTED COMPUTING, 2015, 77 : 58 - 68
  • [5] A Parallel Tabu Search for the Large-scale Quadratic Assignment Problem
    Abdelkafi, Omar
    Derbel, Bilel
    Liefooghe, Arnaud
    2019 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2019, : 3070 - 3077
  • [6] Solving resource-constrained project scheduling problems using Tabu Search
    Ikonomou, A
    Galletly, JE
    Daniel, RC
    INTELLIGENT SYSTEMS FOR MANUFACTURING: MULTI-AGENT SYSTEMS AND VIRTUAL ORGANIZATION, 1998, : 311 - 322
  • [7] Solving the job shop scheduling problem with tabu search
    Univ of Texas at Austin, Austin, United States
    IIE Trans, 2 (257-263):
  • [8] Solving the Electric Vehicle Scheduling Problem at Large-Scale
    Cokyasar, Taner
    Verbas, Omer
    Davatgari, Amir
    Mohammadian, Abolfazl
    2023 IEEE 26TH INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION SYSTEMS, ITSC, 2023, : 1134 - 1139
  • [9] Large-Scale Scheduling with Routing, Batching and Release Dates for Wafer Fabs using Tabu Search
    Schwenke, Clemens
    Blankenstein, Henri
    Kabitzsch, Klaus
    2018 IEEE 23RD INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION (ETFA), 2018, : 472 - 479
  • [10] Combining Nearest Neighbor Search with Tabu Search for Large-Scale Vehicle Routing Problem
    Du, Lingling
    He, Ruhan
    INTERNATIONAL CONFERENCE ON SOLID STATE DEVICES AND MATERIALS SCIENCE, 2012, 25 : 1536 - 1546