The construction of water resources and hydropower projects will inevitably give rise to a large number of reservoir resettlement. Pursuant to the prevailing Preparation Method and Calculation Standard of Design Estimate for Hydropower Projects, some resettlement costs have been externalized. Thus, the conclusions from project financial evaluation might be "distorted", making it difficult for decision-makers to make the right decision on project feasibility; on the other hand, the resettlement compensation level is low, imposing the economic and social costs incurred by construction on the migrants unfairly and leading to poverty. This article discusses the composition of resettlement costs of water resources and hydropower projects, and analyzes the externalized resettlement costs, including those not included in the prevailing cost standard for reservoir resettlement and those entirely excluded.
引用
收藏
页码:1427 / 1432
页数:6
相关论文
共 50 条
  • [21] Turkey's water resources and hydropower potential
    Demirbas, A
    Bakis, R
    ENERGY EXPLORATION & EXPLOITATION, 2003, 21 (5-6) : 405 - 414
  • [22] Empirical Analysis of Cost Overrun in the Hydropower projects of Himachal Pradesh
    Devi, Sharda
    Kaur, Kanwaljit
    INTERNATIONAL JOURNAL OF EARLY CHILDHOOD SPECIAL EDUCATION, 2022, 14 (01) : 3476 - 3481
  • [23] Environmental management of water resources and hydropower in Brazil
    Loureiro, Solange Maria
    Duarte do Vale Pereira, Vera Lucia
    REVISTA ELETRONICA EM GESTAO EDUCACAO E TECNOLOGIA AMBIENTAL, 2014, 18 (01): : 388 - 398
  • [24] Turkey's water resources and hydropower potential
    Demirbas, A
    Bakis, R
    ENERGY EXPLORATION & EXPLOITATION, 2005, 23 (01) : 19 - 29
  • [25] Research on modeling technology of overburden layer for 3D geological model in water resources and hydropower projects
    Qian Hua
    Qiao Shi-fan
    Xu Wen-long
    Liu Bao-chen
    ROCK AND SOIL MECHANICS, 2014, 35 (07) : 2103 - 2108
  • [26] Research on modeling technology of overburden layer for 3D geological model in water resources and hydropower projects
    Qian, Hua
    Qiao, Shi-Fan
    Xu, Wen-Long
    Liu, Bao-Chen
    Yantu Lixue/Rock and Soil Mechanics, 2014, 35 (07): : 2103 - 2108
  • [27] Discussion on reasonable choice of hydropower projects construction design flood standard
    Yao, Fuhai
    Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2007, 26 (02): : 65 - 69
  • [28] AN APPROACH TO RISK AND UNCERTAINTY IN BENEFIT-COST-ANALYSIS OF WATER-RESOURCES PROJECTS
    GOICOECHEA, A
    KROUSE, MR
    ANTLE, LG
    WATER RESOURCES RESEARCH, 1982, 18 (04) : 791 - 799
  • [29] Marginal opportunity cost method for hydropower rights transfer pricing of water projects on the west route of South to North
    College of Hydraulic and Hydroelectric Engineering, Sichuan University, Chengdu 610065, China
    Shuili Fadian Xuebao, 2007, 1 (20-23):
  • [30] Environmental impacts of water resources projects
    Chitale, MA
    ENVIRONMENTAL MANAGEMENT IN HYDRO ELECTRIC PROJECTS, PROCEEDINGS, 2000, : 39 - 44