DISCUSSION OF RESETTLEMENT COST EXTERNALIZATION OF WATER RESOURCES AND HYDROPOWER PROJECTS

被引:2
|
作者
Chen, Shaojun [1 ]
机构
[1] Hohai Univ, Nanjing, Peoples R China
关键词
water resources and hydropower projects; resettlement costs; externalization;
D O I
10.1007/978-3-540-89465-0_249
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
The construction of water resources and hydropower projects will inevitably give rise to a large number of reservoir resettlement. Pursuant to the prevailing Preparation Method and Calculation Standard of Design Estimate for Hydropower Projects, some resettlement costs have been externalized. Thus, the conclusions from project financial evaluation might be "distorted", making it difficult for decision-makers to make the right decision on project feasibility; on the other hand, the resettlement compensation level is low, imposing the economic and social costs incurred by construction on the migrants unfairly and leading to poverty. This article discusses the composition of resettlement costs of water resources and hydropower projects, and analyzes the externalized resettlement costs, including those not included in the prevailing cost standard for reservoir resettlement and those entirely excluded.
引用
收藏
页码:1427 / 1432
页数:6
相关论文
共 50 条
  • [1] INVOLUNTARY RESETTLEMENT IN HYDROPOWER PROJECTS
    GUTMAN, PS
    ANNUAL REVIEW OF ENERGY AND THE ENVIRONMENT, 1994, 19 : 189 - 210
  • [2] On the Institutional Innovation of Resettlement Compensation of Water Conservancy and Hydropower Projects in China
    Luo Yongneng
    PROCEEDINGS OF THE 10TH INTERNATIONAL CONFERENCE ON INNOVATION AND MANAGEMENT, 2013, : 738 - 744
  • [3] Provision of Human Resources for Water Resources and Hydropower Projects——A case of CGGC
    Guo Zhimin (CGGC Staff & Workers Training and Education Center
    当代经理人(中旬刊), 2006, (07) : 178 - 179
  • [4] Provision of Human Resources for Water Resources and Hydropower Projects——A case of CGGC
    Guo Zhimin CGGC Staff Workers Training and Education Center Yichang China
    当代经理人, 2006, (07) : 178 - 179
  • [5] Review of and analysis on resettlement induced by hydropower projects in China
    Wang, Kui
    Liu, Huanyong
    Deng, Yi
    Chen, Jing
    PROCEEDINGS OF THE 2017 2ND INTERNATIONAL CONFERENCE ON CIVIL, TRANSPORTATION AND ENVIRONMENTAL ENGINEERING (ICCTE 2017), 2017, 135 : 670 - 673
  • [6] Research on Resettlement and Resettlement of Water Conservancy Projects
    Xiong, Rao
    Hui, Xue
    PROCEEDINGS OF THE 2017 2ND INTERNATIONAL CONFERENCE ON CIVIL, TRANSPORTATION AND ENVIRONMENTAL ENGINEERING (ICCTE 2017), 2017, 135 : 407 - 410
  • [7] The Study on Emergency Management System of Supergiant Water Resources and Hydropower Projects
    Wang Jing
    Zheng Xiazhong
    2011 2ND INTERNATIONAL CONFERENCE ON CHALLENGES IN ENVIRONMENTAL SCIENCE AND COMPUTER ENGINEERING (CESCE 2011), VOL 11, PT C, 2011, 11 : 1142 - 1146
  • [8] Development of the computer software for the investigation and design of water resources and hydropower projects
    Xie, Fang
    Shuili Fadian/Water Power, (11): : 50 - 52
  • [9] Brief Introduction and Analysis of Hydropower Projects that Induced Resettlement in China
    Deng, Yi
    Yang, Sheng
    Wang, Kui
    PROCEEDINGS OF THE 2017 6TH INTERNATIONAL CONFERENCE ON ENERGY AND ENVIRONMENTAL PROTECTION (ICEEP 2017), 2017, 143 : 324 - 327
  • [10] MAJOR WATER-RESOURCES PROBLEMS AND PROJECTS IN CHINA - DISCUSSION
    HSU, HY
    WU, FH
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 1989, 115 (04) : 543 - 545