共 50 条
- [41] A joint quay crane assignment and scheduling problem: formulation, solution algorithm and computational results Optimization Letters, 2015, 9 : 799 - 817
- [43] The Three-Objective Optimization Model of Flexible Workshop Scheduling Problem for Minimizing Work Completion Time, Work Delay Time, and Energy Consumption TEHNICKI GLASNIK-TECHNICAL JOURNAL, 2021, 15 (01): : 76 - 83
- [45] Three convergence results for continuous descent methods with a convex objective function Journal of Applied and Numerical Optimization, 2019, 1 (01): : 53 - 61
- [47] The web replica allocation and topology assignment problem in wide area networks: Algorithms and computational results COMPUTATIONAL SCIENCE AND ITS APPLICATIONS - ICCSA 2005, VOL 4, PROCEEDINGS, 2005, 3483 : 772 - +
- [49] The gateways location and topology assignment problem in hierarchical wide area networks: Algorithms and computational results COMPUTATIONAL SCIENCE AND ITS APPLICATIONS - ICCSA 2006, PT 3, 2006, 3982 : 1100 - 1109