Automated Down-Hole Testing System for Drilled Shaft Slurry

被引:0
|
作者
Mullins, Miles [1 ]
Mullins, Gray [2 ]
机构
[1] PSI, 4960 Vulcan Ave, Columbus, OH 43212 USA
[2] Univ S Florida, Dept Civil & Environm Engn, 4202 E Fowler Ave,ENB 118, Tampa, FL 33620 USA
关键词
drill slurry; drilled shaft; slurry testing;
D O I
10.1520/STP161120170146
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Proper performance of slurries used to stabilize drilled shaft excavations is achieved by ensuring that the density, viscosity, and sand content stay within empirically defined limits set by past experience, research findings, or manufacturer recommendations. When slurry properties fall outside these limits, the excavation walls can collapse or material can become entrapped within the shaft concrete, or both. Therefore, it is imperative that the slurry be periodically tested starting prior to its introduction into the excavation. Because all measurements are performed manually, slurry testing is time-consuming. However, with the overwhelming advances in digital devices, it is not unreasonable to assume that slurry property tests are equally applicable to this trend. This paper introduces a prototype down-hole slurry testing system that was shown to be surprisingly easy and fast to use despite the experimental nature of the design. One of the demonstration shafts sampled at six different depths was tested in less than 10 min. In contrast, conventional, manually performed testing can take more than an hour to perform the same number of tests.
引用
收藏
页码:128 / 144
页数:17
相关论文
共 50 条
  • [21] CROSS-HOLE AND DOWN-HOLE VS BY MECHANICAL IMPULSE
    STOKOE, KH
    HOAR, RJ
    BALLARD, RF
    JOURNAL OF THE GEOTECHNICAL ENGINEERING DIVISION-ASCE, 1979, 105 (10): : 1257 - 1259
  • [22] DOWN-HOLE TV - GREATEST SHOW IN EARTH
    LLOYD, DP
    GROUND WATER AGE, 1970, 4 (10): : 28 - &
  • [23] LOW-SPEED DOWN-HOLE MOTORS
    GUSMAN, MT
    VADETSKIY, UV
    BALDENKO, DF
    NIKOMAROV, SS
    NEFTYANOE KHOZYAISTVO, 1979, (09): : 23 - 27
  • [24] VERTILOG - DOWN-HOLE CASING INSPECTION SERVICE
    HAIRE, JN
    JOURNAL OF PETROLEUM TECHNOLOGY, 1977, 29 (MAR): : 272 - 272
  • [25] WELL COOLING BY DOWN-HOLE CIRCULATION OF WATER
    KELLER, HH
    COUCH, EJ
    SOCIETY OF PETROLEUM ENGINEERS JOURNAL, 1968, 8 (04): : 405 - &
  • [26] Drilled Shaft Load Testing during Design
    Qubain, Bashar S.
    Seksinsky, Eric J.
    Li, Jianchao
    Nuzha, Kamil
    Eshete, Daniel W.
    IFCEE 2021: INSTALLATION, TESTING, AND ANALYSIS OF DEEP FOUNDATIONS, 2021, 323 : 257 - 266
  • [27] Assessing reliability of drilled shaft integrity testing
    Construction Technology Lab, Inc, Skokie, United States
    Transp Res Rec, 1633 (108-116):
  • [28] Assessing reliability of drilled shaft integrity testing
    Davis, AG
    LIQUEFACTION, DIFFERENTIAL SETTLEMENT, AND FOUNDATION ENGINEERING, 1998, (1633): : 108 - 116
  • [29] Design and Optimization of Multistage Tubular–Mandrel System for Down-Hole Expandable Tubular
    Rashid Khan
    Arabian Journal for Science and Engineering, 2021, 46 : 2083 - 2095
  • [30] Universal developing system for down-hole tools with Manchester coding communication interface
    Li, Huiyin
    Cejing Jishu/Well Logging Technology, 23 (03): : 194 - 197