Solving scheduling problems in grid resource management using an evolutionary algorithm

被引:0
|
作者
Stucky, Karl-Uwe [1 ]
Jakob, Wilfried [1 ]
Quinte, Alexander [1 ]
Suess, Wolfgang [1 ]
机构
[1] Forschungszentrum Karlsruhe, Inst Appl Comp Sci, D-76021 Karlsruhe, Germany
关键词
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Evolutionary Algorithms (EA) are well suited for solving optimisation problems, especially NP-complete problems. This paper presents the application of the Evolutionary Algorithm GLEAM (General Learning and Evolutionary Algorithm and Method) in the field of grid computing. Here, grid resources like computing power, software, or storage have to be allocated to jobs that are running in heterogeneous computing environments. The problem is similar to industrial resource scheduling, but has additional characteristics like co-scheduling and high dynamics within the resource pool and the set of requesting jobs. The paper describes the deployment of GLEAM in the global optimising grid resource broker GORBA (Global Optimising Resource Broker and Allocator) and the first promising results in a grid simulation environment.
引用
收藏
页码:1252 / 1262
页数:11
相关论文
共 50 条
  • [41] An Evolutionary Algorithm for Solving Bilevel Programming Problems Using Duality Conditions
    Li, Hecheng
    Fang, Lei
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2012, 2012
  • [42] SCHEDULING IN HETEROGENEOUS COMPUTING AND GRID ENVIRONMENTS USING A PARALLEL CHC EVOLUTIONARY ALGORITHM
    Nesmachnow, Sergio
    Alba, Enrique
    Cancela, Hector
    COMPUTATIONAL INTELLIGENCE, 2012, 28 (02) : 131 - 155
  • [43] A method of solving scheduling problems using improved guided genetic algorithm
    Ou, Gyouhi
    Tamura, Hiroki
    Tanno, Koichi
    Tang, Zheng
    IEEJ Transactions on Electronics, Information and Systems, 2008, 128 (08) : 1351 - 1357
  • [44] A Method of Solving Scheduling Problems Using an Improved Guided Genetic Algorithm
    Ou, Gyouhi
    Tamura, Hiroki
    Tanno, Koichi
    Tang, Zheng
    ELECTRONICS AND COMMUNICATIONS IN JAPAN, 2010, 93 (08) : 15 - 22
  • [45] Grid resource management of HowU grid system and its grid scheduling
    Zou, D. (deqiangzhou@mail.hust.edu.cn), 2005, Huazhong University of Science and Technology (33):
  • [46] Study on PSO algorithm in solving grid task scheduling
    Ji, Yi-Mu
    Wang, Ru-Chuan
    Tongxin Xuebao/Journal on Communications, 2007, 28 (10): : 60 - 66
  • [47] Solving resource-constrained project scheduling problems using Tabu Search
    Ikonomou, A
    Galletly, JE
    Daniel, RC
    INTELLIGENT SYSTEMS FOR MANUFACTURING: MULTI-AGENT SYSTEMS AND VIRTUAL ORGANIZATION, 1998, : 311 - 322
  • [48] Resource management and task scheduling in grid computing
    Luo, J
    Ji, P
    Wang, XZ
    Zhu, Y
    Li, F
    Ma, T
    Wang, XP
    PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN, VOL 2, 2004, : 431 - 436
  • [49] A Novel Evolutionary Algorithm Solving Optimization Problems
    Chen, C. L. Philip
    Zhang, Tong
    Sik Chung, Tam
    2014 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS (SMC), 2014, : 557 - 561
  • [50] Empirically discovering dominance relations for scheduling problems using an evolutionary algorithm
    Al-Anzi, F. S.
    Allahverdi, A.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (22) : 4701 - 4712