Solving scheduling problems in grid resource management using an evolutionary algorithm

被引:0
|
作者
Stucky, Karl-Uwe [1 ]
Jakob, Wilfried [1 ]
Quinte, Alexander [1 ]
Suess, Wolfgang [1 ]
机构
[1] Forschungszentrum Karlsruhe, Inst Appl Comp Sci, D-76021 Karlsruhe, Germany
关键词
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Evolutionary Algorithms (EA) are well suited for solving optimisation problems, especially NP-complete problems. This paper presents the application of the Evolutionary Algorithm GLEAM (General Learning and Evolutionary Algorithm and Method) in the field of grid computing. Here, grid resources like computing power, software, or storage have to be allocated to jobs that are running in heterogeneous computing environments. The problem is similar to industrial resource scheduling, but has additional characteristics like co-scheduling and high dynamics within the resource pool and the set of requesting jobs. The paper describes the deployment of GLEAM in the global optimising grid resource broker GORBA (Global Optimising Resource Broker and Allocator) and the first promising results in a grid simulation environment.
引用
收藏
页码:1252 / 1262
页数:11
相关论文
共 50 条
  • [1] Solving Multimode Resource-Constrained Project Scheduling Problems Using an Organizational Evolutionary Algorithm
    Wang, Lixia
    Liu, Jing
    PROCEEDINGS OF THE 18TH ASIA PACIFIC SYMPOSIUM ON INTELLIGENT AND EVOLUTIONARY SYSTEMS, VOL 1, 2015, : 271 - 283
  • [2] Solving Grid Scheduling Problems Using Selective Breeding Algorithm
    Sriramya, P.
    Karthika, R. A.
    FIRST INTERNATIONAL CONFERENCE ON SUSTAINABLE TECHNOLOGIES FOR COMPUTATIONAL INTELLIGENCE, 2020, 1045 : 581 - 591
  • [3] Solving project scheduling problems with resource constraints via an event list-based evolutionary algorithm
    Paraskevopoulos, D. C.
    Tarantilis, C. D.
    Ioannou, G.
    EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (04) : 3983 - 3994
  • [4] A Heuristic Algorithm for Solving Resource Constrained Project Scheduling Problems
    Chand, Shelvin
    Singh, Hemant Kumar
    Ray, Tapabrata
    2017 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2017, : 225 - 232
  • [5] Memetic algorithm for solving resource constrained project scheduling problems
    Rahman, Humyun Fuad
    Chakrabortty, Ripon K.
    Ryan, Michael J.
    AUTOMATION IN CONSTRUCTION, 2020, 111
  • [6] Memetic Algorithm for solving Resource Constrained Project Scheduling Problems
    Ali, Ismail M.
    Elsayed, Saber M.
    Ray, Tapabrata
    Sarker, Ruhul A.
    2015 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2015, : 2761 - 2767
  • [7] Solving flow shop scheduling problems by quantum differential evolutionary algorithm
    Tianmin Zheng
    Mitsuo Yamashiro
    The International Journal of Advanced Manufacturing Technology, 2010, 49 : 643 - 662
  • [8] Solving flow shop scheduling problems by quantum differential evolutionary algorithm
    Zheng, Tianmin
    Yamashiro, Mitsuo
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 49 (5-8): : 643 - 662
  • [9] Effective Evolutionary Algorithm for Solving the Real-Resource-Constrained Scheduling Problem
    Dang Quoc, Huu
    Nguyen The, Loc
    Nguyen Doan, Cuong
    Xiong, Naixue
    JOURNAL OF ADVANCED TRANSPORTATION, 2020, 2020 (2020)
  • [10] A backtracking algorithm for solving mixed task scheduling and resource allocation problems
    Sellami, I
    Huguet, MJ
    Lopez, P
    ETFA 2001: 8TH IEEE INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, VOL 2, PROCEEDINGS, 2001, : 741 - 744