Chronographical Spatiotemporal Planning for Construction Projects

被引:0
|
作者
Francis, Adel [1 ]
机构
[1] Quebec Univ, Construct Engn Dept, MGPlan Lab, Ecole Technol Super ETS, Montreal, PQ, Canada
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Most building projects are scheduled using the Gantt/Precedence diagram method, which is a timeline scheduling approach that combines a graphical representation of activities through a bar chart diagram and constraints on precedence dependencies logic. The linear diagram is also marginally used for scheduling building projects. The lack of consideration of the sequence of work and traffic in the limited spaces of construction sites makes the resolution of conflicts more complex; deterministic and stochastic mathematical optimization techniques have been used to solve these problems. However, these solutions are less viable for application in real projects. There are too many parameters to be considered or processed with reasonable efforts and time. Graphic modeling is considered an appropriate solution because of its communication capability. Coordination and decision-making on construction sites become simpler, and spatiotemporal graphical planning is then more suitable as a scheduling model because it considers activities, resources, and spaces simultaneously. This paper presents an explanation of the chronographical spatiotemporal modeling solution that integrates considerations of the space, crews, and operations in the same image. The objective is to link the spatial and temporal aspects to ensure suitable rotation of the workforce in various spaces and efficient linear production. An approach that calculates the project duration is based on critical space and the site occupancy rate; the model also defines seven space management layers (creation of spaces, installation of systems, envelopes, division of spaces, finishing, closing of spaces, and exterior works). The validation process was performed using several case studies on scheduling building projects. In conclusion, the integration of spaces, operations, and temporal aspects promotes efficient use of building sites and helps managers maximize the site occupancy rates, ensure suitable rotation of the workforce between zones and support linear productions of spaces and teams.
引用
收藏
页码:201 / 209
页数:9
相关论文
共 50 条
  • [31] MATERIAL AND FACILITY LAYOUT PLANNING IN CONSTRUCTION PROJECTS USING SIMULATION
    Alanjari, Pejman
    RazaviAlavi, SeyedReza
    AbouRizk, Simaan
    PROCEEDINGS OF THE 2014 WINTER SIMULATION CONFERENCE (WSC), 2014, : 3388 - 3398
  • [32] Ergonomic Risk Mitigation through Workforce Planning for Construction Projects
    Tao, Yu
    Hu, Hao
    Xu, Feng
    Zhang, Zhipeng
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2025, 151 (04)
  • [33] Analysis of the quality control planning in residential construction projects in Spain
    Mesa Fernandez, Jose Manuel
    Pacios Gonzalez, Cesar
    Alvarez Cabal, Valeriano
    Villanueva Balsera, Joaquin
    REVISTA DE LA CONSTRUCCION, 2016, 15 (02): : 106 - 114
  • [34] Collaborative Planning Metrics in Construction Projects: A Factor Analysis Approach
    Elsayegh, Amr
    El-Adaway, Islam
    CONSTRUCTION RESEARCH CONGRESS 2022: PROJECT MANAGEMENT AND DELIVERY, CONTRACTS, AND DESIGN AND MATERIALS, 2022, : 825 - 834
  • [35] Methodology of Planning the Course of the Cumulative Cost Curve in Construction Projects
    Konior, Jaroslaw
    Szostak, Mariusz
    SUSTAINABILITY, 2020, 12 (06)
  • [36] Dynamic facilities planning model for large scale construction projects
    Al Hawarneh, Alaa
    Bendak, Salaheddine
    Ghanim, Firas
    AUTOMATION IN CONSTRUCTION, 2019, 98 : 72 - 89
  • [37] The Project Management Process of Planning and Budgeting in Public Construction Projects
    Larsen, Jesper Kranker
    Ussing, Lene Faber
    Brunoe, Thomas Ditlev
    Lindhard, Soren Munch
    INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT, 2015, 6 (04) : 20 - 33
  • [38] The use and limitations of mathematical models in the planning and control of construction projects
    Cusack, M.M.
    Construction Management and Economics, 1984, 2 (03) : 219 - 224
  • [39] A hybrid simulation approach for site layout planning in construction projects
    Taghaddos, Hosein
    Heydari, Mohammad Hosein
    Asgari, AmirHosein
    CONSTRUCTION INNOVATION-ENGLAND, 2021, 21 (03): : 417 - 440
  • [40] A Dynamic Model for Effective and Optimal Planning of Formwork in Construction Projects
    Baskova, Renata
    Tazikova, Alena
    Strukova, Zuzana
    Kozlovska, Maria
    Cabala, Jozef
    BUILDINGS, 2023, 13 (07)