EXPLORATION OF PRACTITIONER EXPERIENCES OF FLEXIBILITY AND TRANSPARENCY TO IMPROVE BIM-BASED MODEL CHECKING SYSTEMS

被引:5
|
作者
Gade, Peter N. [1 ,2 ]
Svidt, Kjeld [2 ]
机构
[1] Univ Coll Northern Denmark, Dept Architectural Technol & Construct Management, Aalborg, Denmark
[2] Aalborg Univ, Dept Civil Engn, Aalborg, Denmark
关键词
BIM-based Model Checking; BIM; Flexibility; Transparency; QUANTITATIVE METHODS; CONSTRUCTION; MANAGEMENT; SCIENCE;
D O I
10.36680/j.itcon.2021.055
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The use of BIM-based Model Checking (BMC) has the potential to improve building design processes by enabling the automation of building assessments. However, only a few BMC systems are being used in the building design practices. The limited use has been identified to be related to socio-technical challenges that have so far not received much attention in research regarding BMC systems. To explore these challenges, a Design Science Research methodology was used to design a BMC prototype to improve the socio-technical challenges of BMC systems, specifically challenges of transparency and flexibility. The prototype was tested with practitioners to investigate aspects of BMC systems that potentially hinder its use. The results were used to discuss the potential for more practical application of BMC systems in design practices to obtain the benefits of providing a faster, more consistent, and more precise assessment of buildings.
引用
收藏
页码:1041 / 1060
页数:20
相关论文
共 50 条
  • [41] Research on Organizational Structure Model of BIM-Based EPC Project
    Bian, Li
    He, Guiyou
    2013 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT SCIENCE (ICIEMS 2013), 2013, : 696 - 701
  • [42] A Framework for BIM-based Quality Supervision Model in Project Management
    Gang, Jun
    Feng, Chun
    Shu, Wei
    PROCEEDINGS OF THE THIRTEENTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, VOL 2, 2020, 1002 : 234 - 242
  • [43] Collaboration barriers in BIM-based construction networks: A conceptual model
    Oraee, Mehran
    Hosseini, M. Reza
    Edwards, David J.
    Li, Heng
    Papadonikolaki, Eleni
    Cao, Dongping
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2019, 37 (06) : 839 - 854
  • [44] BIM-based model for sustainable built environment in Saudi Arabia
    Hasanain, Fatma A.
    Nawari, Nawari O.
    FRONTIERS IN BUILT ENVIRONMENT, 2022, 8
  • [45] Promotion of the Application of BIM in China-A BIM-Based Model for Construction Material Recycling
    Zhang, Kefei
    Jia, Jing
    RECYCLING, 2021, 6 (01) : 1 - 11
  • [46] BIM-based automated design of drainage systems for panelized residential buildings
    Zhang, Nan
    Wang, Jingwen
    Al-Hussein, Mohamed
    Yin, Xianfei
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (15) : 2683 - 2698
  • [47] An Economic Analysis of BIM-Based Data Collection Systems in Facility Management
    Adams, Gunnar
    Walther, Dierk
    ICCREM 2017: PROJECT MANAGEMENT AND CONSTRUCTION TECHNOLOGY, 2017, : 1 - 10
  • [48] Integration of Automated Safety Rule Checking (ASRC) System for Safety Planning BIM-Based Projects in Malaysia
    Takim, Roshana
    Zulkifli, Muhammad Hanafi
    Nawawi, Abdul Hadi
    ASEAN-TURKEY ASLI QOL2015: AICQOL2015, 2016, 222 : 103 - 110
  • [49] BIM-based integrated information framework for architectural and structural design model
    Liu Z.
    Li Y.
    Lu X.
    Zhang H.
    Tongji Daxue Xuebao/Journal of Tongji University, 2010, 38 (07): : 948 - 953
  • [50] Development of a conceptual model for evaluating the success of BIM-based construction projects
    Olugboyega, Oluseye
    Edwards, David J.
    Windapo, Abimbola Olukemi
    Omopariola, Emmanuel Dele
    Martek, Igor
    SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2021, 10 (04) : 681 - 701