First operating experiences of beam position monitors in the TESLA Test Facility Linac

被引:0
|
作者
Lorenz, R [1 ]
Sachwitz, M [1 ]
Schreiber, HJ [1 ]
Tonisch, F [1 ]
Castellano, M [1 ]
Patteri, P [1 ]
Tazzioli, F [1 ]
Catani, L [1 ]
机构
[1] Tech Univ Berlin, D-10587 Berlin, Germany
来源
PROCEEDINGS OF THE 1997 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-3: PLENARY AND SPECIAL SESSIONS ACCELERATORS AND STORAGE RINGS - BEAM DYNAMICS, INSTRUMENTATION, AND CONTROLS | 1998年
关键词
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Different types of monitors were installed in the TESLA Test Facility Linac to measure the beam position. At each superconducting quadrupole, the transverse beam position will be measured with a resolution of better than 10 mu m, using a cylindrical cavity excited in the TM110-mode by an off-center beam. In addition, two 'warm' cavities working at room temperature were built for the Injector I and the Bunch Compressor. The amplitude of the TM110-mode and its phase are measured in a homodyne receiver. For the experimental area, stripline monitors having a resolution of better than 100 mu m were built, tested and installed. The averaged position of the whole bunch train of Injector I is measured in a narrowband receiver using the amplitude-to-phase conversion. This paper summarizes the designs, cold tests and first operating experiences of both monitor types.
引用
收藏
页码:2137 / 2139
页数:3
相关论文
共 50 条
  • [41] SRF test facility for the superconducting LINAC “RAON” — RRR property and e-beam welding
    Yoochul Jung
    Myungook Hyun
    Jongdae Joo
    Mijoung Joung
    Journal of the Korean Physical Society, 2015, 66 : 454 - 458
  • [42] Concept of electron beam diagnostic for the VUVSASE FEL at the TESLA test facility (TTF FEL) at DESY
    Hahn, U
    Pflüger, J
    Schmidt, G
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 1999, 429 (1-3): : 276 - 280
  • [43] Concept of electron beam diagnostic for the VUVSASE FEL at the TESLA Test Facility (TTF FEL) at DESY
    Hahn, U
    Pflüger, J
    Schmidt, G
    FREE ELECTRON LASERS 1998, 1999, : 276 - 280
  • [44] First beam measurements at the photo injector test facility at DESY Zeuthen
    Bakker, R
    von Hartrott, M
    Jaeschke, E
    Krämer, D
    Carneiro, JP
    Flöttmann, K
    Piot, P
    Rossbach, J
    Schreiber, S
    Abrahamyan, K
    Bähr, J
    Bohnet, I
    Djordjadze, V
    Gensch, U
    Graboschi, HJ
    Li, Z
    Lipka, D
    Oppelt, A
    Petrossyan, B
    Stephan, F
    Michelato, P
    Pagani, C
    Sertore, D
    Miltcheve, V
    Tsakov, I
    Liero, A
    Redlin, H
    Sandner, W
    Schumann, R
    Will, I
    Cee, R
    Krassilnikov, M
    Setzer, S
    Weiland, T
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2003, 507 (1-2): : 210 - 214
  • [45] Proton beam writing nanoprobe facility design and first test results
    van Kan, J. A.
    Malar, P.
    de Vera, Armin Baysic
    Chen, Xiao
    Bettiol, A. A.
    Watt, F.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2011, 645 (01): : 113 - 115
  • [46] Development of nanometer resolution C-band radio frequency beam position monitors in the Final Focus Test Beam
    Mazaheri, G
    Slaton, T
    Shintake, T
    BEAM INSTRUMENTATION WORKSHOP, 1998, 451 : 394 - 394
  • [47] First beam waist measurements in the final focus beam line at the KEK Accelerator Test Facility
    Bai, Sha
    Aryshev, Alexander
    Bambade, Philip
    Mc Cormick, Doug
    Bolzon, Benoit
    Gao, Jie
    Tauchi, Toshiaki
    Zhou, Feng
    PHYSICAL REVIEW SPECIAL TOPICS-ACCELERATORS AND BEAMS, 2010, 13 (09):
  • [48] The mechanical design and preliminary testing results of beam position monitors for the LANSCE isotope production facility and Switchyard Kicker projects
    O'Hara, JF
    Gilpatrick, JD
    Ledford, JE
    Shurter, RB
    Roybal, RJ
    Bentley, BE
    BEAM INSTRUMENTATION WORKSHOP 2002, 2002, 648 : 305 - 312
  • [49] First demonstration of simultaneous measurement of beam current, beam position, and beam tilt on induction linac using combined B-dot monitor
    He, Xiaozhong
    Pang, Jian
    Chen, Nan
    Li, Qin
    Dai, Wenhua
    Ma, Chaofan
    Zhao, Liangchao
    Gao, Feng
    Dai, Zhiyong
    REVIEW OF SCIENTIFIC INSTRUMENTS, 2017, 88 (06):
  • [50] Commissioning and first results of the ITER-relevant negative ion beam test facility ELISE
    Franzen, P.
    Heinemann, B.
    Fantz, U.
    Wuenderlich, D.
    Kraus, W.
    Froeschle, M.
    Martens, C.
    Riedl, R.
    Nocentini, R.
    Masiello, A.
    Ruf, B.
    Schiesko, L.
    Wimmer, C.
    FUSION ENGINEERING AND DESIGN, 2013, 88 (12) : 3132 - 3140