Life cycle assessment of a Danish office building designed for disassembly

被引:111
|
作者
Eberhardt, Leonora Charlotte Malabi [1 ]
Birgisdottir, Harpa [1 ]
Birkved, Morten [2 ,3 ]
机构
[1] Aalborg Univ, Danish Bldg Res Inst, Dept Energy Efficiency Indoor Climate & Sustainab, Copenhagen, Denmark
[2] Tech Univ Denmark DTU, Dept Management Engn, Div Quantitat Sustainabil Assessment QSA, Lyngby, Denmark
[3] Univ Southern Denmark, Dept Chem Engn Biotechnol & Environm Technol, SDU Life Cycle Engn, Odense, Denmark
来源
BUILDING RESEARCH AND INFORMATION | 2019年 / 47卷 / 06期
关键词
building design; building materials; buildings; circular economy; design for disassembly (DfD); end of life; life cycle assessment; waste reduction; ENVIRONMENTAL PERFORMANCE; EMBODIED ENERGY; UNCERTAINTY; CHALLENGES;
D O I
10.1080/09613218.2018.1517458
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The building industry is responsible for a large proportion of anthropogenic environmental impacts. Circular economy (CE) is a restorative and regenerative industrial economic approach that promotes resource efficiency to reduce waste and environmental burdens. Transitioning from a linear approach to a CE within the building industry will be a significant challenge. However, an insufficient number of quantitative studies exist to confirm the potential (positive) environmental effects of CE within the built environment as well as a consistent method for characterizing these effects. This paper considers key methodological issues for quantifying the environmental implications of CE principles and proposes a life cycle assessment (LCA) allocation method to address these issues. The proposed method is applied to a case study of a Danish office building where the concrete structure is designed for disassembly (DfD) for subsequent reuse. The potential environmental impact savings vary between the different impact categories. The savings are significantly influenced by the building's material composition, particularly the number of component-use cycles as well as the service life of the building and its components. The substitution of other material choices (e.g. glass and wood) for the concrete structure exhibited a potential increase in impact savings.
引用
收藏
页码:666 / 680
页数:15
相关论文
共 50 条
  • [31] Assessing office building life cycle costs at preliminary design stage
    Khanduri, AC
    Bedard, C
    Alkass, S
    STRUCTURAL ENGINEERING REVIEW, 1996, 8 (2-3): : 105 - 114
  • [32] Impact of building service life models on life cycle assessment
    Grant, Aneurin
    Ries, Robert
    BUILDING RESEARCH AND INFORMATION, 2013, 41 (02): : 168 - 186
  • [33] Measuring office fit-out changes to determine recurring embodied energy in building life cycle assessment
    Forsythe, Perry
    Wilkinson, Sara
    FACILITIES, 2015, 33 (3-4) : 262 - +
  • [34] Life Cycle Assessment applied to circular designed construction materials
    Zanni, Sara
    Simion, Isabela Maria
    Gavrilescu, Mariana
    Bonoli, Alessandra
    25TH CIRP LIFE CYCLE ENGINEERING (LCE) CONFERENCE, 2018, 69 : 154 - 159
  • [35] Screening life cycle assessment of an office used for academic purposes
    Gaidajis, Georgios
    Angelakoglou, Komninos
    JOURNAL OF CLEANER PRODUCTION, 2011, 19 (14) : 1639 - 1646
  • [36] ENVIRONMENTAL LIFE CYCLE ASSESSMENT OF OFFICE BUILDINGS - ANALYSIS OF DETERMINANTS
    Neururer, Christoph
    Smutny, Roman
    Treberspurg, Martin
    Sellner, Gregor
    SUSTAINABLE BUILDING AND REFURBISHMENT FOR NEXT GENERATIONS, 2013, : 749 - 752
  • [37] Life cycle analysis of GHG emissions from the building retrofitting: The case of a Norwegian office building
    Rabani, Mehrdad
    Madessa, Habtamu Bayera
    Ljungstrom, Malin
    Aamodt, Lene
    Lovvold, Sandra
    Nord, Natasa
    BUILDING AND ENVIRONMENT, 2021, 204
  • [38] Life cycle assessment and life cycle costing of multistorey building: Attributional and consequential perspectives
    Fauzi, Rizal Taufiq
    Lavoie, Patrick
    Tanguy, Audrey
    Amor, Ben
    BUILDING AND ENVIRONMENT, 2021, 197
  • [39] Modular methodology for building life cycle assessment for a building stock model
    Szalay, Zs.
    Kiss, B.
    LIFE-CYCLE ANALYSIS AND ASSESSMENT IN CIVIL ENGINEERING: TOWARDS AN INTEGRATED VISION, 2019, : 855 - 861
  • [40] Functional unit influence on building life cycle assessment
    Hugo Henrique de Simone Souza
    Patrícia Pereira de Abreu Evangelista
    Diego Lima Medeiros
    Jaume Albertí
    Pere Fullana-i-Palmer
    Marc Árpád Boncz
    Asher Kiperstok
    Jardel Pereira Gonçalves
    The International Journal of Life Cycle Assessment, 2021, 26 : 435 - 454