Performance of a top-down excavation in shanghai: case study and numerical exploration

被引:9
|
作者
Yang, Zhenkun [1 ,2 ]
Chen, Youliang [1 ]
Azzam, Rafig [2 ]
Yan, Chao [3 ]
机构
[1] Univ Shanghai Sci & Technol, Dept Civil Engn, 516 Jungong Rd, Shanghai 200093, Peoples R China
[2] Rhein Westfal TH Aachen, Dept Engn Geol & Hydrogeol, Aachen, Germany
[3] Shanghai Construct Grp, Engn Gen Inst, Shanghai, Peoples R China
基金
中国国家自然科学基金;
关键词
Excavation; diaphragm wall; displacement; finite element analysis; case study; FINITE-ELEMENT-ANALYSIS; GROUND MOVEMENTS; WALL;
D O I
10.1080/19648189.2021.2013950
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A 24-m-deep top-down excavation surrounded by densely packed properties in Shanghai has been constructed and monitored recently. Based on the well-documented field data, this paper presents a case study of the project. Performances of the excavation are presented and evaluated by comparison with case histories worldwide. After that, a series of numerical analyses are carried out to decide a reliable method to consider joints in the diaphragm wall in three-dimensional (3D) simulations through calibration with the field data. On the basis of the verified model, several numerical explorations are then carried out to investigate the performances of different construction scenarios. Through the study, the following findings are obtained: (1) joints in the diaphragm wall should be carefully considered when simulating the excavation with 3D models; otherwise, the calculated displacements near the corners would be underestimated dramatically; (2) using weaker materials to represent the lower part of the diaphragm wall has negligible impact on the calculated displacements; (3) the elevated road near the excavation is influenced negligibly; when the road is heavily loaded, however, the road undergoes significant uneven settlements due to the excavation; (4) if two adjacent excavations were constructed simultaneously, the displacement field would become very unfavourable.
引用
收藏
页码:7932 / 7957
页数:26
相关论文
共 50 条
  • [11] Structural behavior in top-down excavation method
    Fateh, Amir
    Hejazi, Farzad
    Ming, Yong Pei
    Jafaar, Mohd Saleh
    ARABIAN JOURNAL OF GEOSCIENCES, 2015, 8 (09) : 7399 - 7408
  • [12] Structural behavior in top-down excavation method
    Amir Fateh
    Farzad Hejazi
    Yong Pei Ming
    Mohd Saleh Jafaar
    Arabian Journal of Geosciences, 2015, 8 : 7399 - 7408
  • [13] Numerical analysis and field monitoring on deformation of the semi-top-down excavation in Shanghai
    Department of Civil Engineering, Shanghai Jiao Tong University, Shanghai, China
    Geotech Spec Publ, 243 GSP (198-207):
  • [14] Top-down Excavation of a Metro Station in Soft Clay
    Lu, Ye
    Tan, Yong
    ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 2866 - +
  • [15] Performance of buildings around a long irregular excavation by top-down technique in downtown Nanjing
    Gu, Z. X.
    Li, H.
    Meng, Z. L.
    Lu, H. Z.
    Sun, Y.
    2020 THE FIFTH INTERNATIONAL CONFERENCE ON BUILDING MATERIALS AND CONSTRUCTION (ICBMC 2020), 2020, 829
  • [16] The Deformation Analysis of a Deep Frame Top-Down Excavation in Downtown Shanghai Based on the 3D FEM
    Bai, Ting
    Xie, Dong
    ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [17] Exploration of top-down effects in the detection of faces
    Edmonds, AJ
    Lewis, MB
    Johnston, RA
    PERCEPTION, 2003, 32 : 172 - 172
  • [18] Poland: A Case of Top-Down Polarization
    Tworzecki, Hubert
    ANNALS OF THE AMERICAN ACADEMY OF POLITICAL AND SOCIAL SCIENCE, 2019, 681 (01): : 97 - 119
  • [19] A Top-Down Approach for Hierarchical Cluster Exploration by Visualization
    Zhang, Ke-Bing
    Orgun, Mehmet A.
    Busch, Peter A.
    Nayak, Abhaya C.
    ADVANCED DATA MINING AND APPLICATIONS, ADMA 2010, PT I, 2010, 6440 : 497 - 508
  • [20] Predicting Lateral Wall Deflection in Top-down Excavation by Neural Network
    Chern, Shuhgi
    Tsai, Juei-Hsing
    Chien, Lien-Kwei
    Huang, Chong-Yue
    INTERNATIONAL JOURNAL OF OFFSHORE AND POLAR ENGINEERING, 2009, 19 (02) : 151 - 157