The lifetime dynamics of a deep water riser design

被引:3
|
作者
Watters, AJ [1 ]
Smith, IC [1 ]
Garrett, DL [1 ]
机构
[1] BAESEMA Ltd, Aberdeen, Scotland
关键词
hybrid; riser; dynamics; towing; upending; connection; installation; fatigue;
D O I
10.1016/S0141-1187(98)00011-X
中图分类号
P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
This paper discusses the dynamics of a hybrid production riser designed for a water depth of 1500 m in the harsh environment west of Shetland where one of the main design drivers is offshore installation time. To minimise installation time, a free standing riser was developed comprising a carrier pipe, top and bottom taper sections and an integral subsurface buoy connected by flexibles to the moored FPSO. The paper discusses the different dynamic characteristics of the structure during tow out, upending, connection and when installed. The simulation methods used, the design drivers, design compromises and parameter sensitivities are also discussed. It is concluded from extensive dynamic analysis and structural design that the proposed design is feasible and the estimated on-site installation time is 2-3 weeks. (C) 1998 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:69 / 81
页数:13
相关论文
共 50 条
  • [21] A COMPREHENSIVE APPROACH TO DEEP-WATER MARINE RISER MANAGEMENT
    DENISON, EB
    KOLPAK, MM
    GARRETT, DL
    JOURNAL OF PETROLEUM TECHNOLOGY, 1985, 37 (05): : 835 - 842
  • [22] LONGITUDINAL VIBRATION OF DEEP WATER DRILLING RISER IN DISCONNECTED MODE
    Yang, Huohai
    Yang, Zhaozhong
    Mao, Liangjie
    CHEMISTRY AND TECHNOLOGY OF FUELS AND OILS, 2018, 54 (03) : 372 - 381
  • [23] DRILLING RISER DISCONNECTION CHALLENGES IN ULTRA-DEEP WATER
    Diezel, Alexandre
    Venero, Germain
    Gomes, Victor
    Muniz, Leandro
    Fachini, Rafael
    Corrignan, Hugues
    PROCEEDINGS OF THE ASME 37TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, 2018, VOL 1, 2018,
  • [24] Calculation method of riser top tension in deep water drilling
    Yang Jin
    Meng Wei
    Yao Mengbiao
    Gao Deli
    Zhou Bo
    Xu Yunjin
    PETROLEUM EXPLORATION AND DEVELOPMENT, 2015, 42 (01) : 119 - 122
  • [25] Simulation Study of Reentry Dynamics of a Deep-Water Drilling Riser System Based on Model Predictive Control
    Zhang C.
    Meng S.
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2023, 57 (11): : 1389 - 1399
  • [26] Longitudinal Vibration of Deep Water Drilling Riser in Disconnected Mode
    Huohai Yang
    Zhaozhong Yang
    Liangjie Mao
    Chemistry and Technology of Fuels and Oils, 2018, 54 : 372 - 381
  • [27] RISER INSTRUMENTATION - DEEP-WATER DRILLING CAMPAIGN RESULTS
    SCHAWANN, JC
    SPARKS, C
    JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 1985, 107 (04): : 408 - 414
  • [28] ARTICULATED MULTILINE PRODUCTION RISER FOR DEEP-WATER APPLICATION
    ORTLOFF, JE
    CALDWELL, JB
    TEERS, ML
    MECHANICAL ENGINEERING, 1977, 99 (01) : 103 - 103
  • [29] Deep water riser collision avoidance by top tension control
    Rustad, Anne M.
    Larsen, Carl M.
    Sorensen, Asgeir J.
    Proceedings of the 26th International Conference on Offshore Mechanics and Arctic Engineering, Vol 1, 2007, : 205 - 214
  • [30] Calculation method of riser top tension in deep water drilling
    Key Laboratory for Petroleum Engineering of the Ministry of Education, China University of Petroleum, Beijing
    102249, China
    Shiyou Kantan Yu Kaifa, 1 (107-110):