Optimization of Deck Construction Staging for Multiple-Span Continuous Steel Girder Bridge

被引:7
|
作者
Su, Dan [1 ,2 ]
Nassif, Hani [3 ]
Xia, Ye [1 ]
机构
[1] Tongji Univ, Dept Bridge Engn, 1239 Siping Rd, Shanghai 200092, Peoples R China
[2] Lamar Univ, Dept Civil & Environm Engn, Beaumont, TX 77706 USA
[3] Rutgers State Univ, Dept Civil & Environm Engn, 623 Bowser Rd, Piscataway, NJ 08854 USA
基金
中国国家自然科学基金;
关键词
Construction staging; Crack control; Continuous bridge; Finite-element model; Field testing; TRANSVERSE CRACKING; CONCRETE STRUCTURES; BUILDINGS; SHORES; LOADS;
D O I
10.1061/(ASCE)CF.1943-5509.0001073
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Cracking in concrete deck has been the major concern to bridge designers as well as owners. Excessive cracking not only would affect the performance and serviceability of the bridge but also reduce the service life of the concrete deck and increase the maintenance cost. It is proven that many factors could cause the cracking of concrete deck including restrained shrinkage, temperature effects, applied live load, and improper construction sequence. Among these factors, appropriate construction staging plays an important role in minimizing the cracking of concrete deck, especially for multiple span continuous bridges. However, the construction staging has not been subjected to detailed research in the past. Therefore, it is important to evaluate the current concrete deck construction staging practice and propose an optimized construction staging for multiple span continuous bridges, if needed. In this study, the research approach adopted is aimed at investigating the cracking of a typical multiple-span continuous bridge, evaluating the construction staging, and providing an optimized practice for deck construction staging. A typical three-span continuous bridge was selected for investigation and various types of sensors were instrumented on the bridge to monitor the behavior of the structure during and after construction. The finite-element (FE) model was developed and validated with the data collected from field testing. Based on FE analysis and experimental data, the cracking of the bridge deck was investigated and alternative construction staging scenarios were simulated and compared. Moreover, based on analysis results, an optimized deck construction staging practice was recommended for future use.
引用
收藏
页数:11
相关论文
共 50 条
  • [41] Jindong Bridge: Suspension Bridge with Steel Truss Girder and Prefabricated RC Deck Slabs in China
    Zhang, Wenming
    Liu, Zhao
    Xu, Song
    STRUCTURAL ENGINEERING INTERNATIONAL, 2019, 29 (02) : 315 - 318
  • [42] DYNAMIC BEHAVIOR OF MULTI SPAN CONTINUOUS GIRDER BRIDGE WITH ISOLATION BEARINGS
    Roy, S. S.
    Dash, S. R.
    INTERNATIONAL JOURNAL OF BRIDGE ENGINEERING, 2018, 6 (02): : 1 - 23
  • [43] Vibration response of continuous girder bridge based on wheel⁃deck coherent excitation
    Han Z.-Q.
    Xie G.
    Zhuo Y.-J.
    Luo Z.-L.
    Li H.-T.
    Jilin Daxue Xuebao (Gongxueban)/Journal of Jilin University (Engineering and Technology Edition), 2024, 54 (02): : 436 - 444
  • [44] Shaking Table Test of a Long-span Continuous Girder Bridge
    Chen, Yanjiang
    Zhou, Daxing
    Yan, Weiming
    Tang, Zhenyun
    TRENDS IN CIVIL ENGINEERING, PTS 1-4, 2012, 446-449 : 242 - 246
  • [45] Predicting the Girder Rotation for Bridge Deck Construction Using Deep Neural Network
    Hui, Li
    Hindi, Riyadh
    STRUCTURES CONGRESS 2023, 2023, : 195 - 205
  • [46] Construction and experimental analysis of a pedestrian bridge with concrete deck and IPC truss girder
    Giannopoulos, G
    Vantomme, J
    Wastiels, J
    Taerwe, L
    SCIENCE AND ENGINEERING OF COMPOSITE MATERIALS, 2004, 11 (01) : 9 - 18
  • [47] Removal of diaphragms from three-span steel girder bridge
    Auburn Univ, Auburn, United States
    Journal of Bridge Engineering, 1999, 4 (01): : 63 - 70
  • [48] Performance of glass fiber-reinforced polymer deck on steel girder bridge
    Chajes, MJ
    Shenton, HW
    Finch, WW
    DESIGN OF STRUCTURES 2001: BRIDGES, OTHER STRUCTURES, AND HYDRAULICS AND HYDROLOGY, 2001, (1770): : 105 - 112
  • [49] Development of an Advanced Orthotropic Steel Deck System for Long Span Bridge
    Oh, C. K.
    Hong, K. J.
    Bae, D.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, RESILIENCE AND SUSTAINABILITY, 2012, : 3586 - 3590
  • [50] Modal analysis of a three-span curved steel girder bridge
    Nielson, BG
    Womack, KC
    Halling, MW
    NONDESTRUCTIVE EVALUATION OF HIGHWAYS, UTILITIES, AND PIPELINES IV, 2000, 3995 : 146 - 152