共 50 条
- [11] Enhanced migrating birds optimization algorithm for hybrid flowshop group scheduling problem with unrelated parallel machines Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2022, 28 (12): : 3912 - 3922
- [12] Scalable parallel implementation of migrating birds optimization for the multi-objective task allocation problem The Journal of Supercomputing, 2021, 77 : 2689 - 2712
- [13] Scalable parallel implementation of migrating birds optimization for the multi-objective task allocation problem JOURNAL OF SUPERCOMPUTING, 2021, 77 (03): : 2689 - 2712
- [14] Automatic algorithm design for multi-objective hybrid flowshop scheduling problem with variable sublots Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2022, 28 (11): : 3403 - 3420
- [17] A multi-objective electromagnetism algorithm for a bi-objective hybrid no-wait flowshop scheduling problem INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 70 (9-12): : 1591 - 1601
- [18] A multi-objective electromagnetism algorithm for a bi-objective hybrid no-wait flowshop scheduling problem The International Journal of Advanced Manufacturing Technology, 2014, 70 : 1591 - 1601