Modeling order assignment for semiconductor assembly hierarchical outsourcing and developing the decision support system

被引:7
|
作者
Chien, Chen-Fu [2 ,3 ]
Wu, Jei-Zheng [1 ]
Weng, Yu-De [2 ]
机构
[1] Soochow Univ, Dept Business Adm, Taipei, Taiwan
[2] Natl Tsing Hua Univ, Dept Ind Engn & Engn Management, Hsinchu, Taiwan
[3] Natl Tsing Hua Univ, EMBA, Hsinchu, Taiwan
关键词
Outsourcing; Order assignment; Semiconductor manufacturing; Supply chain management; Logistics; Goal programming; VENDOR SELECTION; SUPPLY CHAIN; CAPACITY; INTEGRATION; DEMAND; BUY;
D O I
10.1007/s10696-010-9073-0
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Outsourcing has become increasingly important in supply chain management. As the semiconductor industry is capital-intensive, semiconductor manufacturing companies focus on wafer fabrication as their core competence and outsource assembly and testing to a number of specialized vendors. The involved decision-making has multiple objectives such as (1) minimizing the number of delayed orders, (2) minimizing the allocation ratio differences, (3) minimizing the assembly cost, and (4) minimizing the product changeover times. To meet these objectives in practice, this study proposes an approach that employs mixed integer linear programming and goal programming to integrate multiple objectives and operational feasibility by considering mass orders, order fulfillment, capacity limits, logistics timetables, and a rolling mechanism in a real setting. Furthermore, we developed an order assignment decision support system embedded with the proposed approach for assigning assembly outsourcing orders and validated the system in a semiconductor company in Taiwan. The results have shown the practical viability of the proposed approach in terms of decision quality and computational efficiency. This study concludes with empirical findings and a discussion of future research directions.
引用
收藏
页码:109 / 139
页数:31
相关论文
共 50 条
  • [1] Modeling order assignment for semiconductor assembly hierarchical outsourcing and developing the decision support system
    Chen-Fu Chien
    Jei-Zheng Wu
    Yu-De Weng
    Flexible Services and Manufacturing Journal, 2010, 22 : 109 - 139
  • [2] An intelligent decision support system for IT outsourcing
    Buyukozkan, Gulcin
    Feyzioglu, Orhan
    FUZZY SYSTEMS AND KNOWLEDGE DISCOVERY, PROCEEDINGS, 2006, 4223 : 1303 - 1312
  • [3] Decision support system for outsourcing strategies
    Fontana, Marcele Elisa
    Santos Aragao, Joao Paulo
    Morais, Danielle Costa
    PRODUCTION ENGINEERING-RESEARCH AND DEVELOPMENT, 2019, 13 (05): : 547 - 555
  • [4] Decision support system for outsourcing strategies
    Marcele Elisa Fontana
    João Paulo Santos Aragão
    Danielle Costa Morais
    Production Engineering, 2019, 13 : 547 - 555
  • [5] A decision support system for the production control of a semiconductor packaging assembly line
    Mok, P. Y.
    EXPERT SYSTEMS WITH APPLICATIONS, 2009, 36 (03) : 4423 - 4430
  • [6] Developing and Testing a Computerized Decision Support System for Nurse-to-Patient Assignment
    van Oostveen, Catharina J.
    Braaksma, Aleida
    Vermeulen, Hester
    CIN-COMPUTERS INFORMATICS NURSING, 2014, 32 (06) : 276 - 285
  • [7] Modeling strategic semiconductor assembly outsourcing decisions based on empirical settings
    Jei-Zheng Wu
    Chen-Fu Chien
    OR Spectrum, 2008, 30 : 401 - 430
  • [8] Modeling strategic semiconductor assembly outsourcing decisions based on empirical settings
    Wu, Jei-Zheng
    Chien, Chen-Fu
    OR SPECTRUM, 2008, 30 (03) : 401 - 430
  • [9] A DECISION SUPPORT SYSTEM FOR PARKING SPACE ASSIGNMENT
    VENKATARAMANAN, MA
    BORNSTEIN, M
    MATHEMATICAL AND COMPUTER MODELLING, 1991, 15 (08) : 71 - 76
  • [10] OUTSOURCING LOGISTICS DECISION SUPPORT SYSTEM FOR PRODUCT DESIGN AND MANUFACTURING
    Bargelis, A.
    PROCEEDINGS ICIL'2010: INTERNATIONAL CONFERENCE ON INDUSTRIAL LOGISTICS - LOGISTICS AND SUSTAINABILITY, 2010, : 13 - 20