Thermal Modeling of a Solar Steam Turbine With a Focus on Start-Up Time Reduction

被引:23
|
作者
Spelling, James [1 ]
Jocker, Markus [2 ]
Martin, Andrew [1 ]
机构
[1] Royal Inst Technol, Dept Energy Technol, SE-10044 Stockholm, Sweden
[2] Siemens Ind Turbomachinery, SE-61283 Finspang, Sweden
来源
JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME | 2012年 / 134卷 / 01期
关键词
solar thermal power; steam-turbine; start-up; cool-down; dispatchability increase;
D O I
10.1115/1.4004148
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Steam turbines in solar thermal power plants experience a much greater number of starts than those operating in baseload plants. In order to preserve the lifetime of the turbine while still allowing fast starts, it is of great interest to find ways to maintain the turbine temperature during idle periods. A dynamic model of a solar steam turbine has been elaborated, simulating both the heat conduction within the body and the heat exchange with the gland steam, main steam and the environment, allowing prediction of the temperatures within the turbine during off-design operation and standby. The model has been validated against 96 h of measured data from the Andasol 1 power plant, giving an average error of 1.2% for key temperature measurements. The validated model was then used to evaluate a number of modifications that can be made to maintain the turbine temperature during idle periods. Heat blankets were shown to be the most effective measure for keeping the turbine casing warm, whereas increasing the gland steam temperature was most effective in maintaining the temperature of the rotor. By applying a combination of these measures the dispatchability of the turbine can be improved significantly: electrical output can be increased by up to 9.5% after a long cooldown and up to 9.8% after a short cooldown. [DOI: 10.1115/1.4004148]
引用
收藏
页数:8
相关论文
共 50 条
  • [21] EXPERIENCE IN DDC TURBINE START-UP
    HOWARD, JR
    ISA JOURNAL, 1966, 13 (07): : 61 - &
  • [22] INVESTIGATION INTO THE THERMAL LIMITATIONS OF STEAM TURBINES DURING START-UP OPERATION
    Topel, Monika
    Laumert, Bjorn
    Nilsson, Asa
    Jocker, Markus
    PROCEEDINGS OF THE ASME TURBO EXPO: TURBINE TECHNICAL CONFERENCE AND EXPOSITION, 2017, VOL 8, 2017,
  • [23] Investigation Into the Thermal Limitations of Steam Turbines During Start-Up Operation
    Topel, Monika
    Nilsson, Asa
    Jocker, Markus
    Laumert, Bjorn
    JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 2018, 140 (01):
  • [24] OPTIMIZATION OF THE START-UP TIME OF STEAM TURBOSETS WITH THE TURBOTROL-4 ELECTRONIC TURBINE CONTROL-SYSTEM
    GRUBER, H
    LOITZL, W
    BROWN BOVERI REVIEW, 1979, 66 (10): : 678 - 684
  • [25] Effect of the Modification of the Start-Up Sequence on the Thermal Stresses for a Microgas Turbine
    Tenango-Pirin, Oscar
    Garcia, J. C.
    Castro-Gomez, Laura
    Rodriguez, J. A.
    Sierra, F.
    De Santiago, Oscar
    Rodriguez-Lelis, J. M.
    INTERNATIONAL JOURNAL OF ROTATING MACHINERY, 2016, 2016 (2016)
  • [26] Optimal Start-Up Policies for a Solar Thermal Power Plant
    Lopez-Alvarez, Maricarmen
    Flores-Tlacuahuac, Antonio
    Ricardez-Sandoval, Luis
    Rivera-Solorio, Carlos
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2018, 57 (03) : 1026 - 1038
  • [27] CONTINUOUS STEAM BLOW CUTS CFB PLANT START-UP TIME
    REYNOLDS, M
    POWER ENGINEERING, 1991, 95 (04) : 63 - 63
  • [28] Flow Parameter Changes in Steam Turbine 10 MW during Start-Up and Heating
    Hoznedl, Michal
    Tajc, Ladislav
    36TH MEETING OF DEPARTMENTS OF FLUID MECHANICS AND THERMODYNAMICS, 2017, 1889
  • [30] Start-Up Time and Thermal Losses of a Particle Solar Receiver under Transient Operating Conditions
    Rafique, Muhammad Mujahid
    SOLARPACES 2020 - 26TH INTERNATIONAL CONFERENCE ON CONCENTRATING SOLAR POWER AND CHEMICAL ENERGY SYSTEMS, 2022, 2445