A Tabu Search Algorithm to Minimize Lateness in Scheduling Problems with Setup Times

被引:0
|
作者
Gonzalez, Miguel A. [1 ]
Vela, Camino R. [1 ]
Varela, Ramiro [1 ]
机构
[1] Univ Oviedo, AI Ctr, Spain Campus Viesques S-N, Gijon 33271, Spain
来源
关键词
JOB-SHOP PROBLEM; SHIFTING BOTTLENECK;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
We face the Job Shop Scheduling Problem with Sequence Dependent Setup Times and maximum lateness minimization as objective function. We propose a disjunctive graph representation for this problem that allows to define the concept of critical path properly. From this representation, we have defined a neighborhood structure suitable to cope with lateness minimization. This neighborhood structure is exploited in combination with a Tabu Search algorithm. We report results from an experimental study across conventional benchmark instances showing that this approach outperforms some of the current state-of-the-art methods.
引用
收藏
页码:212 / +
页数:3
相关论文
共 50 条
  • [31] Tabu search for scheduling on identical parallel machines to minimize mean tardiness
    Vinı´cius A. Armentano
    Denise S. Yamashita
    Journal of Intelligent Manufacturing, 2000, 11 : 453 - 460
  • [32] Single machine scheduling with batch set-up times to minimize maximum lateness
    A.M.A. Hariri
    C.N. Potts
    Annals of Operations Research, 1997, 70 : 75 - 92
  • [33] A survey of scheduling problems with setup times or costs
    Allahverdi, Ali
    Ng, C. T.
    Cheng, T. C. E.
    Kovalyov, Mikhail Y.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) : 985 - 1032
  • [34] Stochastic scheduling to minimize expected maximum lateness
    Wu, Xianyi
    Zhou, Xian
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 190 (01) : 103 - 115
  • [35] Vehicle scheduling on a tree to minimize maximum lateness
    Karuno, Y
    Nagamochi, H
    Ibaraki, T
    JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, 1996, 39 (03) : 345 - 355
  • [36] Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times
    Allahverdi, Ali
    Al-Anzi, Fawaz S.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (22) : 4713 - 4735
  • [37] A hybrid genetic tabu search algorithm for distributed flexible job shop scheduling problems
    Xie, Jin
    Li, Xinyu
    Gao, Liang
    Gui, Lin
    JOURNAL OF MANUFACTURING SYSTEMS, 2023, 71 : 82 - 94
  • [38] Tabu Search and an Exact Algorithm for the Solutions of Resource-Constrained Project Scheduling Problems
    Omer Atli
    International Journal of Computational Intelligence Systems, 2011, 4 (2) : 255 - 267
  • [39] Tabu Search and an Exact Algorithm for the Solutions of Resource-Constrained Project Scheduling Problems
    Atli, Omer
    INTERNATIONAL JOURNAL OF COMPUTATIONAL INTELLIGENCE SYSTEMS, 2011, 4 (02): : 255 - 267
  • [40] A hybrid genetic tabu search algorithm for distributed job-shop scheduling problems
    Xie, Jin
    Gao, Liang
    Li, Xinyu
    Gui, Lin
    SWARM AND EVOLUTIONARY COMPUTATION, 2024, 90