A Tabu Search Algorithm to Minimize Lateness in Scheduling Problems with Setup Times

被引:0
|
作者
Gonzalez, Miguel A. [1 ]
Vela, Camino R. [1 ]
Varela, Ramiro [1 ]
机构
[1] Univ Oviedo, AI Ctr, Spain Campus Viesques S-N, Gijon 33271, Spain
来源
关键词
JOB-SHOP PROBLEM; SHIFTING BOTTLENECK;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
We face the Job Shop Scheduling Problem with Sequence Dependent Setup Times and maximum lateness minimization as objective function. We propose a disjunctive graph representation for this problem that allows to define the concept of critical path properly. From this representation, we have defined a neighborhood structure suitable to cope with lateness minimization. This neighborhood structure is exploited in combination with a Tabu Search algorithm. We report results from an experimental study across conventional benchmark instances showing that this approach outperforms some of the current state-of-the-art methods.
引用
收藏
页码:212 / +
页数:3
相关论文
共 50 条
  • [1] Lateness minimization with Tabu search for job shop scheduling problem with sequence dependent setup times
    Miguel A. González
    Camino R. Vela
    Inés González-Rodríguez
    Ramiro Varela
    Journal of Intelligent Manufacturing, 2013, 24 : 741 - 754
  • [2] Lateness minimization with Tabu search for job shop scheduling problem with sequence dependent setup times
    Gonzalez, Miguel A.
    Vela, Camino R.
    Gonzalez-Rodriguez, Ines
    Varela, Ramiro
    JOURNAL OF INTELLIGENT MANUFACTURING, 2013, 24 (04) : 741 - 754
  • [3] Genetic Algorithm Combined with Tabu Search for the Job Shop Scheduling Problem with Setup Times
    Gonzalez, Miguel A.
    Vela, Camino R.
    Varela, Ramiro
    METHODS AND MODELS IN ARTIFICIAL AND NATURAL COMPUTATION, PT I: A HOMAGE TO PROFESSOR MIRA'S SCIENTIFIC LEGACY, 2009, 5601 : 265 - +
  • [4] Two-machine flowshop scheduling problem to minimize maximum lateness with bounded setup and processing times
    Allahverdi, Ali
    KUWAIT JOURNAL OF SCIENCE & ENGINEERING, 2006, 33 (02): : 233 - 252
  • [5] Single machine scheduling with major and minor setup times: A tabu search approach
    Nowicki, E
    Zdrzalka, S
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1996, 47 (08) : 1054 - 1064
  • [6] A novel integer programing formulation for scheduling with family setup times on a single machine to minimize maximum lateness
    Hinder, Oliver
    Mason, Andrew J.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 262 (02) : 411 - 423
  • [7] A tabu search heuristic for the multiprocessor scheduling problem with sequence dependent setup times
    Franca, PM
    Gendreau, M
    Laporte, G
    Muller, FM
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1996, 43 (2-3) : 79 - 89
  • [8] Hybrid tabu search algorithm for unrelated parallel machine scheduling in semiconductor fabs with setup times, job release, and expired times
    Chen, Changyu
    Fathi, Mahdi
    Khakifirooz, Marzieh
    Wu, Kan
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 165
  • [9] No-wait flowshop with separate setup times to minimize maximum lateness
    Ruiz, Ruben
    Allahverdi, Ali
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2007, 35 (5-6): : 551 - 565
  • [10] No-wait flowshop with separate setup times to minimize maximum lateness
    Rubén Ruiz
    Ali Allahverdi
    The International Journal of Advanced Manufacturing Technology, 2007, 35 : 551 - 565