The effect of electrochemical chloride extraction on pre-stressed concrete

被引:45
|
作者
Siegwart, M
Lyness, JF
McFarland, BJ
Doyle, G
机构
[1] Univ Ulster, Sch Built Environm, Coleraine BT52 1SA, Londonderry, North Ireland
[2] McFarland Assoc, Belfast, Antrim, North Ireland
[3] John Graham Ltd, Graham Struct Repairs, Dromore, North Ireland
[4] Mageba SA, CH-8180 Bulach, Switzerland
关键词
pre-stressed concrete; corrosion; desalinisation; experiments;
D O I
10.1016/j.conbuildmat.2005.01.012
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Chloride induced corrosion is the main cause of corrosion in reinforced concrete structures. Electrochemical chloride extraction, also known as desalination, is applied to concrete structures containing ordinary reinforcement in order to extract chlorides from the concrete. During this process, atomic hydrogen generated on the steel surface can cause hydrogen embrittlement of the steel. High strength steels, such as those that are used in pre-stressed concrete, are particularly susceptible to hydrogen embrittlement which, at worst, can result in the sudden and unpredictable collapse of a structure. This paper presents the results of a series of constant extension rate tests conducted on 22 pre-stressed concrete specimens that had been subjected to electrochemical chloride extraction. The paper concludes that the risk of hydrogen induced brittle fracture due to electrochemical chloride extraction cannot be altered with modification of the treatment parameters, such as current density or treatment duration. It was also uninfluenced by different surface states of the steel (corroded or not corroded). Therefore, based on the findings of this study, it can be concluded that electrochemical chloride extraction should not be applied to pre-stressed concrete. (c) 2005 Elsevier Ltd. All rights reserved.
引用
收藏
页码:585 / 594
页数:10
相关论文
共 50 条
  • [31] Research on Modal Identification Method of Pre-stressed Concrete Bridge
    Jiang, Hao
    Meng, Guangwei
    Zhang, Haikuo
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 1651 - +
  • [32] Study on Fatigue Performance of Pre-Stressed Concrete Box Girder
    Zhou, Hongyu
    Ma, Quanzhou
    Yuan, Hui
    Zhou, Yun
    6TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND CIVIL ENGINEERING, 2020, 455
  • [34] DESIGN OF PRE-STRESSED CONCRETE T-BEAM BRIDGES
    Kumar, Rajamoori Arun
    Krishna, B. Vamsi
    INTERNATIONAL JOURNAL OF BRIDGE ENGINEERING, 2014, 2 (03): : 1 - 14
  • [35] ACOUSTOELASTIC EFFECTS ON THE NATURAL FREQUENCIES OF PRE-STRESSED CONCRETE BEAMS
    Ryden, N.
    Lundqvist, L.
    Thelandersson, S.
    REVIEW OF PROGRESS IN QUANTITATIVE NONDESTRUCTIVE EVALUATION, VOLS 30A AND 30B, 2011, 1335 : 1379 - 1385
  • [36] Numerical modelling of concrete beams reinforced with pre-stressed CFRP
    P. Neto
    J. Alfaiate
    J. Vinagre
    International Journal of Fracture, 2009, 157 : 159 - 173
  • [37] Synergetic concrete shape and cable layout optimization of pre-stressed concrete beams
    Ishan Jha
    Krishna K. Pathak
    Structural and Multidisciplinary Optimization, 2023, 66
  • [38] Synergetic concrete shape and cable layout optimization of pre-stressed concrete beams
    Jha, Ishan
    Pathak, Krishna K.
    STRUCTURAL AND MULTIDISCIPLINARY OPTIMIZATION, 2023, 66 (04)
  • [39] Effect of electrochemical chloride extraction on the steel reinforced concrete
    Jianzhi, Xu
    Zhu, Ding
    Feng, Xing
    Key Engineering Materials, 2009, 400-402 : 221 - 225
  • [40] Effect of Electrochemical Chloride Extraction on the Steel Reinforced Concrete
    Xu, Jianzhi
    Ding, Zhu
    Xing, Feng
    ADVANCES IN CONCRETE AND STRUCTURES, 2009, 400-402 : 221 - 225