LOW-CARBON FLEXIBLE JOB-SHOP SCHEDULING BASED ON IMPROVED NONDOMINATED SORTING GENETIC ALGORITHM-II

被引:24
|
作者
Seng, D. W. [1 ,2 ]
Li, J. W. [1 ,2 ]
Fang, X. J. [1 ,2 ]
Zhang, X. F. [1 ,2 ]
Chen, J. [1 ,2 ]
机构
[1] Hangzhou Dianzi Univ, Sch Comp Sci & Technol, Hangzhou 310018, Zhejiang, Peoples R China
[2] Minist Educ, Key Lab Complex Syst Modeling & Simulat, Hangzhou 310018, Zhejiang, Peoples R China
基金
中国国家自然科学基金;
关键词
Flexible Job-Shop Scheduling Problem (F[!text type='JS']JS[!/text]P); Nondominated Sorting Genetic Algorithm-II (NSGA-II); Low-Carbon Scheduling; ENERGY-CONSUMPTION; POWER-CONSUMPTION; OPTIMIZATION; FOOTPRINT; MINIMIZATION;
D O I
10.2507/IJSIMM17(4)CO18
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Considering the impacts of multiple production objectives, makespan and low carbon factor on job-shop scheduling optimization, this paper puts forward a novel low carbon scheduling method for flexible job-shop based on the improved nondominated sorting genetic algorithm-II (NSGA-II). Firstly, a low-carbon scheduling optimization model was established for multi-objective, multi-speed job-shop. Then, the flow of the NSGA-II-based core algorithm was explained, and the new population selection was optimized through the calculation of congestion and nondominated level. Finally, multiple simulation examples were adopted to validate the proposed algorithm. The results show that the proposed NSGA-II low carbon optimization algorithm can converge to the global best Pareto solution rapidly, and lower the no-load and total energy consumption of the production line through automatic management while ensuring production efficiency.
引用
收藏
页码:712 / 723
页数:12
相关论文
共 50 条
  • [31] A guide for genetic algorithm based on parallel machine scheduling and flexible job-shop scheduling
    Ak, Bilgesu
    Koc, Erdem
    WORLD CONFERENCE ON BUSINESS, ECONOMICS AND MANAGEMENT (BEM-2012), 2012, 62 : 817 - 823
  • [32] Modified Genetic Algorithm for Flexible Job-Shop Scheduling Problems
    Teekeng, Wannaporn
    Thammano, Arit
    COMPLEX ADAPTIVE SYSTEMS 2012, 2012, 12 : 122 - 128
  • [33] A new genetic algorithm for flexible job-shop scheduling problems
    Driss, Imen
    Mouss, Kinza Nadia
    Laggoun, Assia
    JOURNAL OF MECHANICAL SCIENCE AND TECHNOLOGY, 2015, 29 (03) : 1273 - 1281
  • [34] A new genetic algorithm for flexible job-shop scheduling problems
    Imen Driss
    Kinza Nadia Mouss
    Assia Laggoun
    Journal of Mechanical Science and Technology, 2015, 29 : 1273 - 1281
  • [35] A hybrid and flexible genetic algorithm for the job-shop scheduling problem
    Ferrolho, Antonio
    Crisostomo, Manuel
    2007 INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE IN ROBOTICS AND AUTOMATION, 2007, : 178 - +
  • [36] A Hybrid Genetic Algorithm for Flexible Job-shop Scheduling Problem
    Wang Shuang-xi
    Zhang Chao-yong
    Jin Liang-liang
    ENGINEERING SOLUTIONS FOR MANUFACTURING PROCESSES IV, PTS 1 AND 2, 2014, 889-890 : 1179 - 1184
  • [37] An Efficient Genetic Algorithm for Flexible Job-Shop Scheduling Problem
    Moghadam, Ali Mokhtari
    Wong, Kuan Yew
    Piroozfard, Hamed
    2014 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2014, : 1409 - 1413
  • [38] An effective genetic algorithm for the flexible job-shop scheduling problem
    Zhang, Guohui
    Gao, Liang
    Shi, Yang
    EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (04) : 3563 - 3573
  • [39] Hybrid-sorting Genetic Algorithm for Job-shop Scheduling Problem
    程娜
    崔荣一
    延边大学学报(自然科学版), 2007, (02) : 129 - 133
  • [40] An Improved Genetic Algorithm for Multi-objective Flexible Job-shop Scheduling Problem
    Zhang, Chaoyong
    Wang, Xiaojuan
    Gao, Liang
    MANUFACTURING SCIENCE AND ENGINEERING, PTS 1-5, 2010, 97-101 : 2449 - 2454