Research and Implementation of Lean Production Mode in Shipbuilding

被引:6
|
作者
Song, Tingxin [1 ]
Zhou, Jincheng [1 ]
机构
[1] Hubei Univ Technol, Sch Mech Engn, Wuhan 430068, Peoples R China
基金
中国国家自然科学基金;
关键词
lean shipbuilding; work breakdown structure; task package scheduling; manufacturing execution system;
D O I
10.3390/pr9112071
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
This paper studies the production process of a shipbuilding enterprise. The company suffers from long manufacturing cycle, low utilization rate of personnel and an unbalanced production line. To solve these problems, the lean shipbuilding mode, mainly divided into shipbuilding work breakdown, production plan and virtual flow operation in this paper, is put forward, which combines the lean production and modern information management technology with shipbuilding. Supported by the theory of work breakdown structure and task package scheduling, the shipbuilding task package is reasonably divided. The priority of task package manufacturing is determined by calculating the task package manufacturing sequence coefficient, and a reasonable number of operators is calculated to ensure the continuity of segmented manufacturing. After determining the manufacturing priority of the task pack and the number of allocable personnel, the corresponding work can be scheduled. Production planning drives all production activities of the shipbuilding enterprise, and just-in-time production is achieved through the reasonable arrangement of these production plans, thus reducing the waste of personnel and time. Then, the virtual flow operation is carried out, which can achieve high efficiency of flow production and high flexibility of fixed workstation production during the production process of large-scale and heavy-duty products. The virtual assembly production system of the workshop is established according to the characteristics of shipbuilding operation and the actual production situation. On this basis, a lean shipbuilding manufacturing execution system for small and medium-sized shipbuilding enterprises is developed to achieve lean production in a shipbuilding workshop. Through the implementation of the lean shipbuilding mode based on task package scheduling and its manufacturing execution system, compared with the original data, the ship production cycle is reduced to 76.7%, the number of workers is reduced by 16.7% and the production balance rate is up to 81%.
引用
收藏
页数:14
相关论文
共 50 条
  • [21] IMPLEMENTATION OF LEAN PRACTICES IN BANKS: A QUALITATIVE RESEARCH
    Khan, Zeeshan Ahmad
    Ahmad, Muhammad
    Butt, Sehrish
    INDEPENDENT JOURNAL OF MANAGEMENT & PRODUCTION, 2019, 10 (02): : 489 - 498
  • [22] Production management mode of informationization-based shipbuilding enterprises in China
    Guo, Tao
    Teng, Xianglin
    Yu, Qiuying
    PROCEEDINGS OF THE 2008 INTERNATIONAL CONFERENCE ON E-RISK MANAGEMENT (ICERM 2008), 2008, : 647 - 652
  • [23] RESEARCH IN SHIPBUILDING
    不详
    NATURE, 1961, 192 (480) : 919 - +
  • [24] Improving flow to achieve lean manufacturing in shipbuilding
    Storch, RL
    Lim, S
    PRODUCTION PLANNING & CONTROL, 1999, 10 (02) : 127 - 137
  • [25] Improving flow to achieve lean manufacturing in shipbuilding
    Storch, Richard Lee
    Lim, Sanggyu
    Production Planning and Control, 1999, 10 (02): : 127 - 137
  • [26] Lean Methodology to Transform Shipbuilding Panel Assembly
    Kolich, Damir
    Storch, Richard L.
    Fafandjel, Niksa
    JOURNAL OF SHIP PRODUCTION AND DESIGN, 2017, 33 (04): : 317 - 326
  • [27] Implementation of a Lean Six Sigma Project in a Production Line
    Morais, Valter R.
    Sousa, Sergio D.
    Lopes, Isabel
    WORLD CONGRESS ON ENGINEERING, WCE 2015, VOL II, 2015, : 847 - 852
  • [28] Managing barriers to lean production implementation: context matters
    Marodin, Giuliano Almeida
    Saurin, Tarcisio Abreu
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (13) : 3947 - 3962
  • [29] APPLIED ASPECTS OF THE IMPLEMENTATION OF THE CONCEPT OF LEAN MANUFACTURING IN PRODUCTION
    Khairullina, Albina D.
    Pavlova, Adeliya, V
    Sabirova, Aigyl, I
    Gurianova, Elina A.
    AD ALTA-JOURNAL OF INTERDISCIPLINARY RESEARCH, 2019, 9 (02): : 83 - 87
  • [30] A goal programming approach to lean production system implementation
    Karakutuk, S. Serhat
    Ornek, M. Arslan
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2023, 74 (01) : 403 - 416