Item-based Reliability-centred Life-Cycle Costing using Monte Carlo Simulation

被引:1
|
作者
Reifferscheidt, J. [1 ]
Weigell, J. [2 ]
Jahn, C. [2 ]
机构
[1] Siemens Gamesa, Hamburg, Germany
[2] Hamburg Univ Technol, Hamburg, Germany
来源
EERA DEEPWIND'2021 | 2021年 / 2018卷
关键词
D O I
10.1088/1742-6596/2018/1/012034
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper presents a time-sequential probabilistic simulation model for the detailed design of maintenance strategies for turbine critical items. The term item shall refer to any part, component, device, subsystem, or functional unit of a wind turbine that can be individually described and considered. The model enables wind farm operators and turbine manufactures to find the most cost-effective maintenance strategy for each turbine critical item. Cost optimizations are realized through a better adaptation of the maintenance strategy to the item-specific failure modes, degradation processes, failure detection capabilities and the given operational configuration of the wind farm. Based on a time-sequential Monte Carlo simulation technique, the maintenance activities at turbine level are simulated over the windfarm's operational lifetime, considering correlations between the stochastic variables. The results of the Monte Carlo simulation are evaluated using statistical means, thereby, determining the optimal maintenance strategy and associated parameters. The developed model is implemented as a Python application and equally applicable for onshore and offshore windfarms.
引用
收藏
页数:11
相关论文
共 50 条
  • [21] Quantifying system uncertainty of life cycle assessment based on Monte Carlo simulation
    Ming-Lung Hung
    Hwong-wen Ma
    The International Journal of Life Cycle Assessment, 2009, 14
  • [22] Statistical Analysis of Historical Extreme Water Levels for the US North Atlantic Coast Using Monte Carlo Life-Cycle Simulation
    Nadal-Caraballo, Norberto C.
    Melby, Jeffrey A.
    Gonzalez, Victor M.
    JOURNAL OF COASTAL RESEARCH, 2016, 32 (01) : 35 - 45
  • [23] Automotive reliability assessment using Monte Carlo simulation
    Dey, A
    Tryon, R
    Nasser, L
    SEVENTH ISSAT INTERNATIONAL CONFERENCE ON RELIABILITY AND QUALITY IN DESIGN, 2002, : 6 - 10
  • [24] Using Monte Carlo simulation for assessing software reliability
    Carnes, Patrick
    WMSCI 2006: 10TH WORLD MULTI-CONFERENCE ON SYSTEMICS, CYBERNETICS AND INFORMATICS, VOL I, PROCEEDINGS, 2006, : 174 - 179
  • [25] Life cycle analysis through Monte-Carlo-Simulation
    Feck, Norbert
    Wagner, Herman-Josef
    BWK, 2008, 60 (09): : 52 - +
  • [26] Monte Carlo simulation approach to life cycle cost management
    Wang, Nannan
    Chang, Yen-Chiang
    El-Sheikh, Ahmed A.
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2012, 8 (08) : 739 - 746
  • [27] DETERMINATION OF RELIABILITY USING EVENT-BASED MONTE-CARLO SIMULATION
    KAMAT, SJ
    RILEY, MW
    IEEE TRANSACTIONS ON RELIABILITY, 1975, R 24 (01) : 73 - 75
  • [28] Reliability-based robust geotechnical design using Monte Carlo simulation
    Peng, Xing
    Li, Dian-Qing
    Cao, Zi-Jun
    Gong, Wenping
    Juang, C. Hsein
    BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2017, 76 (03) : 1217 - 1227
  • [29] Using Monte Carlo simulation in life cycle assessment for electric and internal combustion vehicles
    McCleese, DL
    LaPuma, PT
    INTERNATIONAL JOURNAL OF LIFE CYCLE ASSESSMENT, 2002, 7 (04): : 230 - 236
  • [30] Using monte carlo simulation in life cycle assessment for electric and internal combustion vehicles
    David L. McCleese
    Peter T. LaPuma
    The International Journal of Life Cycle Assessment, 2002, 7 : 230 - 236