Item-based Reliability-centred Life-Cycle Costing using Monte Carlo Simulation

被引:1
|
作者
Reifferscheidt, J. [1 ]
Weigell, J. [2 ]
Jahn, C. [2 ]
机构
[1] Siemens Gamesa, Hamburg, Germany
[2] Hamburg Univ Technol, Hamburg, Germany
来源
EERA DEEPWIND'2021 | 2021年 / 2018卷
关键词
D O I
10.1088/1742-6596/2018/1/012034
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper presents a time-sequential probabilistic simulation model for the detailed design of maintenance strategies for turbine critical items. The term item shall refer to any part, component, device, subsystem, or functional unit of a wind turbine that can be individually described and considered. The model enables wind farm operators and turbine manufactures to find the most cost-effective maintenance strategy for each turbine critical item. Cost optimizations are realized through a better adaptation of the maintenance strategy to the item-specific failure modes, degradation processes, failure detection capabilities and the given operational configuration of the wind farm. Based on a time-sequential Monte Carlo simulation technique, the maintenance activities at turbine level are simulated over the windfarm's operational lifetime, considering correlations between the stochastic variables. The results of the Monte Carlo simulation are evaluated using statistical means, thereby, determining the optimal maintenance strategy and associated parameters. The developed model is implemented as a Python application and equally applicable for onshore and offshore windfarms.
引用
收藏
页数:11
相关论文
共 50 条
  • [1] RELIABILITY-BASED LIFE-CYCLE COSTING
    NTUEN, CA
    MICROELECTRONICS AND RELIABILITY, 1987, 27 (05): : 833 - 834
  • [2] Life-Cycle Oriented Risk Assessment Using a Monte Carlo Simulation
    Zust, Simon
    Huonder, Michael
    West, Shaun
    Stoll, Oliver
    APPLIED SCIENCES-BASEL, 2022, 12 (01):
  • [3] Life-cycle reliability of RC jetties in a marine environment using Markov model and sequential Monte Carlo simulation
    Takenaka, K.
    Akiyama, M.
    Frangopol, D. M.
    Yoshida, I.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE EXTENSION, 2014, : 231 - 236
  • [4] IVF cycle cost estimation using Activity Based Costing and Monte Carlo simulation
    Lucia Cassettari
    Marco Mosca
    Roberto Mosca
    Fabio Rolando
    Mauro Costa
    Valerio Pisaturo
    Health Care Management Science, 2016, 19 : 20 - 30
  • [5] IVF cycle cost estimation using Activity Based Costing and Monte Carlo simulation
    Cassettari, Lucia
    Mosca, Marco
    Mosca, Roberto
    Rolando, Fabio
    Costa, Mauro
    Pisaturo, Valerio
    HEALTH CARE MANAGEMENT SCIENCE, 2016, 19 (01) : 20 - 30
  • [6] Using life-cycle costing tools
    Geitner, F
    Galster, D
    CHEMICAL ENGINEERING, 2000, 107 (02) : 80 - 86
  • [7] Using Life-Cycle Costing Tools
    Geitner, Fred
    Galster, David
    Chemical Engineering (New York), 2000, 107 (02): : 80 - 86
  • [8] Vehicle maintenance proces optimisation using life cycle costs data and reliability-centred maintenance
    Vintr, Zdenek
    Valis, David
    Proceedings of the First International Conference on Maintenance Engineering, 2006, : 180 - 188
  • [9] Monte Carlo simulation-based life-cycle assessment method for an old roof steel truss
    Garavaglia, E.
    Sgambi, L.
    Basso, N.
    LIFE-CYCLE OF ENGINEERING SYSTEMS: EMPHASIS ON SUSTAINABLE CIVIL INFRASTRUCTURE, 2017, : 1677 - 1682
  • [10] Life-cycle costing analysis based on concrete durability
    Cao, Weiqun
    Li, Xiaowei
    Zhao, Tiejun
    Proceedings of 2007 International Conference on Construction & Real Estate Management, Vols 1 and 2, 2007, : 476 - 479