The applicability of real-time flood forecasting correction techniques coupled with the Muskingum method

被引:6
|
作者
Yang, Ruixiang [1 ,2 ,3 ]
Hou, Baodeng [1 ]
Xiao, Weihua [1 ]
Liang, Chuan [2 ]
Zhang, Xuelei [1 ]
Li, Baoqi [1 ]
Yu, Haiying [2 ,4 ]
机构
[1] China Inst Water Resources & Hydropower Res, State Key Lab Simulat & Regulat Water Cycle River, Beijing, Peoples R China
[2] Sichuan Univ, State Key Lab Hydraul & Mt River Engn, Coll Water Resource & Hydropower, Chengdu, Peoples R China
[3] Minist Water Resources, Pearl River Comprehens Technol & Network Informat, Guangzhou, Peoples R China
[4] Sichuan Normal Univ, Engn Coll, Chengdu, Peoples R China
来源
HYDROLOGY RESEARCH | 2020年 / 51卷 / 01期
基金
中国国家自然科学基金;
关键词
correction techniques; Muskingum method; Nash-Sutcliffe efficiency; permissible range; real-time flood forecasting; ASSIMILATION; MODELS; FILTER; SYSTEM; RIVER;
D O I
10.2166/nh.2019.128
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
Improving flood forecasting performance is critical for flood management. Real-time flood forecasting correction techniques (e.g., proportional correction (PC) and Kalman filter (KF)) coupled with the Muskingum method improve the forecasting performance but have limitations (e.g., short lead times and inadequate performance, respectively). Here, particle filter (PF) and combination forecasting (CF) are coupled with the Muskingum method and then applied to 10 flood events along the Shaxi River, China. Two indexes (overall consistency and permissible range) are selected to compare the performances of PC, KF, PF and CF for 3 h lead time. The changes in overall consistency for different lead times (1-6 h) are used to evaluate the applicability of PC, KF, PF and CF. The main conclusions are as follows: (1) for 3 h lead time, the two indexes indicate that the PF performance is optimal, followed in order by KF and PC; CF performance is close to PF and better than KF. (2) The performance of PC decreases faster than that of KF and PF with increases in the lead time. PC and PF are applicable for short (1-2 h) and long lead times (3-6 h), respectively. CF is applicable for 1-6 h lead times; however, it has no advantage over PC and PF for short and long lead times, respectively, which may be due to insufficient training and increase in cumulative errors.
引用
收藏
页码:17 / 29
页数:13
相关论文
共 50 条
  • [41] REAL-TIME FLOOD FORECASTING METHOD WITH 1-D UNSTEADY FLOW MODEL
    Mu Jin-bin
    Zhang Xiao-feng
    JOURNAL OF HYDRODYNAMICS, 2007, 19 (02) : 150 - 154
  • [42] Integration of Hydrologic Gray Model with Global Search Method for Real-Time Flood Forecasting
    Kang, Min Goo
    Park, Seung Woo
    Cai, Ximing
    JOURNAL OF HYDROLOGIC ENGINEERING, 2009, 14 (10) : 1136 - 1145
  • [43] Flood4castRTF: A Real-Time Urban Flood Forecasting Model
    Craninx, Michel
    Hilgersom, Koen
    Dams, Jef
    Vaes, Guido
    Danckaert, Thomas
    Bronders, Jan
    SUSTAINABILITY, 2021, 13 (10)
  • [45] Real-time flood forecasting of Huai River with flood diversion and retarding areas
    Li Zhijia
    Bao Hongjun
    Xue Cangsheng
    Hu Yuzhong
    Fang Hong
    WATER SCIENCE AND ENGINEERING, 2008, 1 (02) : 10 - 24
  • [46] Performance assessment of a Bayesian Forecasting System (BFS) for real-time flood forecasting
    Biondi, D.
    De Luca, D. L.
    JOURNAL OF HYDROLOGY, 2013, 479 : 51 - 63
  • [47] A real-time flood forecasting system based on GIS and DEM
    García, SG
    REMOTE SENSING AND HYDROLOGY 2000, 2001, (267): : 439 - 445
  • [48] REAL-TIME FLOOD FORECASTING AND INFORMATION SYSTEM FOR THE STATE OF IOWA
    Krajewski, Witold F.
    Ceynar, Daniel
    Demir, Ibrahim
    Goska, Radoslaw
    Kruger, Anton
    Langel, Carmen
    Mantilla, Ricardo
    Niemeier, James
    Quintero, Felipe
    Seo, Bong-Chul
    Small, Scott J.
    Weber, Larry J.
    Young, Nathan C.
    BULLETIN OF THE AMERICAN METEOROLOGICAL SOCIETY, 2017, 98 (03) : 539 - 554
  • [49] A STOCHASTIC-DYNAMIC MODEL FOR REAL-TIME FLOOD FORECASTING
    CHOW, KCA
    WATT, WE
    WATTS, DG
    WATER RESOURCES RESEARCH, 1983, 19 (03) : 746 - 752
  • [50] Real-time urban flood forecasting and modelling - a state of the art
    Henonin, Justine
    Russo, Beniamino
    Mark, Ole
    Gourbesville, Philippe
    JOURNAL OF HYDROINFORMATICS, 2013, 15 (03) : 717 - 736