摘要
While the literature primarily addresses MPS design from the manufacturer's perspective, this research considers MPS policy design in a two-stage rolling schedule environment with a particular focus on the policy governing schedule flexibility in the non-frozen time interval (i.e. liquid versus slushy orders). Using computer simulation, we experimentally evaluate the impact of four MPS design factors (non-frozen interval policy, planning horizon length, frozen interval length and re-planning frequency) and four environmental factors (natural order cycle length, vendor flexibility, demand range and demand lumpiness) on MPS schedule cost and instability. The experimental design considers the often-conflicting impact of MPS policy on the channel members by capturing performance metrics at the manufacturer, vendor and system level. The research findings indicate that moving from a liquid to a slushy non-interval strategy increases the manufacturer's costs, but may result in an even greater cost reduction for the vendor resulting in lower system costs. The economic benefit of the slushy strategy is directly tied to the vendor's relative flexibility in responding to the manufacturer's orders on a lot-for-lot basis. High vendor flexibility favours the liquid strategy, while low vendor flexibility favours the slushy strategy.
引用
收藏
页码:1933 / 1954
页数:22
相关论文
共 50 条
  • [21] A new heuristic scheduling method for the make-pack-route problem in make-to-order supply chains
    Du, Mu
    Kong, Nan
    Hu, Xiangpei
    INFOR, 2019, 57 (02) : 296 - 313
  • [22] Collaborative production planning with production time windows and order splitting in make-to-order manufacturing
    Pan, Tianyi
    Zhang, Zhi-Hai
    Cao, Hui
    COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 67 : 1 - 9
  • [23] Lead-Time Management in a Make-to-Order Fashion Supply Chain
    Shi, Jing
    Xiao, Tiaojun
    Xu, Tiantian
    2013 INTERNATIONAL CONFERENCE ON MANAGEMENT (ICM 2013), 2013, : 47 - 52
  • [24] Impact of lot release strategies on 'make-to-order' production line performance
    Murray, S.
    Young, P.
    Geraghty, J.
    Sievwright, S.
    ISSM 2007: 2007 INTERNATIONAL SYMPOSIUM ON SEMICONDUCTOR MANUFACTURING, CONFERENCE PROCEEDINGS, 2007, : 233 - +
  • [25] Response time reduction in make-to-order and assemble-to-order supply chain design
    Vidyarthi, Navneet
    Elhedhli, Samir
    Jewkes, Elizabeth
    IIE TRANSACTIONS, 2009, 41 (05) : 448 - 466
  • [26] Supply Chain Scheduling in a Make-to-Order Environment
    Wang, Lei
    Wang, Guoqing
    PROCEEDINGS OF THE FOURTH INTERNATIONAL CONFERENCE ON OPERATIONS AND SUPPLY CHAIN MANAGEMENT (ICOSCM 2010), 2010, 4 : 352 - 355
  • [27] Lead-time quotation and hedging coordination in make-to-order supply chain
    Zhai, Yue
    Cheng, T. C. E.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 300 (02) : 449 - 460
  • [28] Empirical Grounded Simulation Models for Make-To-Order (MTO) Supply Chains: An Application in the Furniture Industry
    Lagorio, Alexandra
    Mangano, Giulio
    Pinto, Roberto
    Rafele, Carlo
    Zenezini, Giovanni
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS-PRODUCTION MANAGEMENT SYSTEMS FOR VOLATILE, UNCERTAIN, COMPLEX, AND AMBIGUOUS ENVIRONMENTS, APMS 2024, PT VI, 2024, 733 : 78 - 91
  • [29] Matching Supply and Demand with Lead-Time Dependent Price and with Safety Stocks in a Make-to-Order Production System
    Das, Sonu Kumar
    Kuthambalayan, Thyagaraj S.
    SYSTEMS, 2022, 10 (06):
  • [30] Responsive make-to-order supply chain network design
    Aboolian, Robert
    Berman, Oded
    Wang, Jiamin
    NAVAL RESEARCH LOGISTICS, 2021, 68 (02) : 241 - 258