共 50 条
- [41] BASIC PLAN OF MEDI-FLOAT ON BIG DISASTER INSTALLED IN THE RIVER PROCEEDINGS OF THE ASME 34TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, 2015, VOL 6, 2015,
- [43] The efficiency of the noise barrier installed on the acoustically untreated gallery MAGAZINE OF CIVIL ENGINEERING, 2018, 82 (06): : 199 - 207
- [48] MULTIPROCESSOR MICROCOMPUTERS TAKE ADVANTAGE OF INSTALLED CP/M BASE MINI-MICRO SYSTEMS, 1983, 16 (14): : 66 - &