AHRI floats plan to address efficiency of installed base

被引:0
|
作者
不详
机构
关键词
D O I
暂无
中图分类号
O414.1 [热力学];
学科分类号
摘要
引用
收藏
页码:6 / 6
页数:1
相关论文
共 50 条
  • [41] BASIC PLAN OF MEDI-FLOAT ON BIG DISASTER INSTALLED IN THE RIVER
    Eto, Hiroaki
    Sato, Chiaki
    Masuda, Koichi
    Ikoma, Tomoki
    Shimizu, Ken
    Kuroyanagi, Akio
    Yamaguchi, Junko
    PROCEEDINGS OF THE ASME 34TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, 2015, VOL 6, 2015,
  • [43] The efficiency of the noise barrier installed on the acoustically untreated gallery
    Shasurin, A. E.
    MAGAZINE OF CIVIL ENGINEERING, 2018, 82 (06): : 199 - 207
  • [44] On spare parts demand and the installed base concept: A theoretical approach
    Amniattalab, Ayda
    Frenk, J. B. G.
    Hekimoglu, Mustafa
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2023, 266
  • [45] Installed base management versus selling in monopolistic and competitive environments
    Bhattacharya, Shantanu
    Robotis, Andreas
    Van Wassenhove, Luk N.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 273 (02) : 596 - 607
  • [46] The value of installed base information for spare part inventory control
    Van der Auweraer, Sarah
    Zhu, Sha
    Boute, Robert N.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2021, 239
  • [47] Digital Radio Installed Base Will Approach 200 Million by 2015
    不详
    MICROWAVE JOURNAL, 2010, 53 (10) : 53 - 53
  • [48] MULTIPROCESSOR MICROCOMPUTERS TAKE ADVANTAGE OF INSTALLED CP/M BASE
    LEWIS, G
    MINI-MICRO SYSTEMS, 1983, 16 (14): : 66 - &
  • [49] Technology Mergers and Acquisitions in the Presence of an Installed Base: A Strategic Analysis
    Wang, Qiu-Hong
    Hui, Kai-Lung
    INFORMATION SYSTEMS RESEARCH, 2017, 28 (01) : 46 - 63
  • [50] Lifecycle Pricing for Installed Base Management with Constrained Capacity and Remanufacturing
    Robotis, Andreas
    Bhattacharya, Shantanu
    Van Wassenhove, Luk N.
    PRODUCTION AND OPERATIONS MANAGEMENT, 2012, 21 (02) : 236 - 252