Availability analysis of power substation automation architectures with PRP and HSR protocols

被引:1
|
作者
Rubinstein, Marcelo G. [1 ]
da Vinha, Thiago M. [1 ]
机构
[1] Univ Estado Rio de Janeiro, Dept Eletron & Telecomunicacoes, Programa Posgrad Engn Eletron, Rio De Janeiro, Brazil
关键词
substation automation; telecommunication network reliability; substations; protocols; local area networks; redundancy; substation protection; IEC standards; IEC; 62439-3; standard; redundancy protocols; parallel redundancy protocol; PRP; high-availability; HSR; higher availability class; availability analysis; power substation automation architectures; industrial automation; electric power substations; 61850; frame reception probability;
D O I
10.1049/iet-gtd.2018.6364
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Industrial automation has been widely used in electric power substations. In this context, the IEC 61850 standard provides for the utilisation of redundancy in the data link layer to increase frame reception probability. This study aims to evaluate the availability of two power substation automation architectures based on the IEC 62439-3 standard, which describes two redundancy protocols named parallel redundancy protocol (PRP) and high-availability seamless redundancy (HSR). The authors evaluate both architectures using either PRP or HSR protocol against using no redundancy protocols. The reliability block diagram method has been used, and afterwards, the mean time to failure and availability have been calculated. Results show that the utilisation of redundancy protocols allied to the repair during the mission allows classifying the architectures in the higher availability class according to CEI IEC 870-4.
引用
收藏
页码:6000 / 6003
页数:4
相关论文
共 50 条
  • [31] Running analysis of substation integrated automation system in unattended
    Gao Yongxin
    ENERGY ENGINEERING AND ENVIRONMENTAL ENGINEERING, PTS 1AND 2, 2013, 316-317 : 145 - 148
  • [32] Requirements for automatic event analysis in substation automation systems
    Apostolov, AP
    2004 IEEE POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1 AND 2, 2004, : 1055 - 1060
  • [33] Life Cycle Cost Analysis of Substation Automation Implementation
    Farias, V. S.
    Fernandes, N. C.
    2014 INTERNATIONAL TELECOMMUNICATIONS SYMPOSIUM (ITS), 2014,
  • [34] Design and analysis for reliability of control function in substation automation
    Wang Wen
    Lin Wei
    Duan Wenjun
    Ma Xiao
    2006 INTERNATIONAL CONFERENCE ON POWER SYSTEMS TECHNOLOGY: POWERCON, VOLS 1- 6, 2006, : 338 - +
  • [35] Availability Analysis and Optimization of HSR-based Ethernet Mesh Networks
    Allawi, Yazan M.
    Lee, Dujeong
    Lee, Kyusang
    Rhee, June-Koo Kevin
    2014 19TH EUROPEAN CONFERENCE ON NETWORKS AND OPTICAL COMMUNICATIONS - (NOC), 2014, : 153 - 158
  • [36] General configuration of automation system within a high voltage power substation
    Trabulus, S
    2000 CANADIAN CONFERENCE ON ELECTRICAL AND COMPUTER ENGINEERING, CONFERENCE PROCEEDINGS, VOLS 1 AND 2: NAVIGATING TO A NEW ERA, 2000, : 1167 - 1171
  • [37] IEC61850 Implementation in Localization of Power Substation Automation System
    Tavakoli, Saeid G.
    Mohammadi, Davood S.
    Gohari, Behrooz M.
    Mir, Mandi
    Mehrabian, Armin
    Razeghi, Behrooz
    Sebtahmadi, S. Sina
    2014 IEEE INTERNATIONAL SYMPOSIUM ON ROBOTICS AND MANUFACTURING AUTOMATION (ROMA), 2014, : 92 - 98
  • [38] SCADA and Substation Automation Systems for the Port of Durban Power Supply Upgrade
    Mnukwa, Siphokazi
    Saha, Akshay K.
    2020 INTERNATIONAL SAUPEC/ROBMECH/PRASA CONFERENCE, 2020, : 637 - 641
  • [39] "Smartizing" Power Quality Assessment Based on IEC Smart Substation Automation
    Brittes, J. L. P.
    Jardini, J. A.
    Magrini, L. C.
    Hokama, W. S.
    Fernandez Silva, L. G.
    2015 IEEE PES INNOVATIVE SMART GRID TECHNOLOGIES LATIN AMERICA (ISGT LATAM), 2015, : 225 - 230
  • [40] Analysis on Jinhua 500 kV integrated substation automation system
    Zhang, Shaohua
    Chen, Weizhong
    Dianli Xitong Zidonghue/Automation of Electric Power Systems, 2000, 24 (06): : 57 - 60