Dataset of metaheuristics for the flow shop scheduling problem with maintenance activities integrated

被引:2
|
作者
Branda, Antonella [1 ]
Castellano, Davide [1 ]
Guizzi, Guido [1 ]
Popolo, Valentina [1 ]
机构
[1] Univ Napoli Federico II, Mat Della Prod Ind, Dipt Ingn Chim, Piazzale Tecchio, I-8080125 Naples, Italy
来源
DATA IN BRIEF | 2021年 / 36卷
关键词
Scheduling; Flow shop; Preventive maintenance; Genetic algorithm; Harmony search;
D O I
10.1016/j.dib.2021.106985
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
This data article presents a flow shop scheduling problem in which machines are not available during the whole planning horizon and the periods of unavailability are due to random faults. The experimental dataset consists of two problems with different sizes. In the largest one, about 2400 problems were analysed and compared with two diffuse metaheuristics: Genetic Algorithm (GA) and Harmony Search (HS). In the smallest, about 600 problems were analysed comparing the solution obtained with an exhaustive algorithm with those obtained by means of GA and HS. This dataset represents a test-bed for further works, allowing a comparison between the solution quality and the computation time obtained with different optimization methods. The substantial computational effort spent to generate the dataset undoubtedly represents a significant asset for the scientific community. (C) 2021 The Authors. Published by Elsevier Inc.
引用
收藏
页数:5
相关论文
共 50 条
  • [41] An Integrated Solution Approach for Flow Shop Scheduling
    Karacan, Ilknur
    Karacan, Ismet
    Senvar, Ozlem
    Bulkan, Serol
    TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2021, 28 (03): : 786 - 795
  • [42] A Multi-Agent Scheduling Approach for the Joint Scheduling of Jobs and Maintenance Operations in the Flow Shop Sequencing Problem
    Khelifati, Si Larabi
    Benbouzid-Sitayeb, Fatima
    COMPUTATIONAL COLLECTIVE INTELLIGENCE: TECHNOLOGIES AND APPLICATIONS, PT II: THIRD INTERNATIONAL CONFERENCE, ICCCI 2011, 2011, 6923 : 60 - 69
  • [43] Flow shop scheduling problem with conflict graphs
    Nour El Houda Tellache
    Mourad Boudhar
    Annals of Operations Research, 2018, 261 : 339 - 363
  • [44] Heuristic algorithms for flow shop scheduling problem
    Wei, Youshuang
    Yang, Xianglong
    Feng, Yuncheng
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2000, 20 (09): : 41 - 47
  • [45] Flow shop scheduling optimization algorithm with periodical maintenance
    School of Mechanical Engineering, Tongji University, Shanghai 201804, China
    不详
    Jisuanji Jicheng Zhizao Xitong, 6 (1379-1387):
  • [46] A contribution to the stochastic flow shop scheduling problem
    Gourgand, M
    Grangeon, N
    Norre, S
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 151 (02) : 415 - 433
  • [47] A hybrid algorithm for flow shop scheduling problem
    Zhang, Changsheng
    Sun, Jigui
    Ning, Jiaxu
    Yang, Qingyun
    2008 PROCEEDINGS OF INFORMATION TECHNOLOGY AND ENVIRONMENTAL SYSTEM SCIENCES: ITESS 2008, VOL 1, 2008, : 182 - 188
  • [48] Flow shop scheduling problem with conflict graphs
    Tellache, Nour El Houda
    Boudhar, Mourad
    ANNALS OF OPERATIONS RESEARCH, 2018, 261 (1-2) : 339 - 363
  • [49] Hybrid Metaheuristics for Job Shop Scheduling Problems
    Nugraheni, Cecilia E.
    Swastiani, D.
    Abednego, L.
    ENGINEERING LETTERS, 2022, 30 (04) : 1444 - 1451
  • [50] Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependent-sequence setup times and makespan minimization
    Miyata, Hugo Hissashi
    Nagano, Marcelo Seido
    Gupta, Jatinder N. D.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 135 : 79 - 104