Setting planned lead-times in a stochastic production environment

被引:0
|
作者
Feng, DZ [1 ]
Yamashiro, M [1 ]
机构
[1] Zhejiang Univ Tech, Coll Mech Engn, Hangzhou 310032, Peoples R China
关键词
stochastic system; lead-time planning; stochastic optimization;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, a serial production system operating on a make-to-order basis is considered, where the actual procurement and processing times are stochastic. The problem is to find the optimal lead-time planning for such a system. We formulate the problem model by trading off expected holding cost at all stages and expected penalty cost for exceeding the total planned lead-time. A stochastic optimization algorithm for a two-stage stochastic production system is proposed to optimize stage lead-times. In the optimization algorithm, perturbation analysis is used to derive the gradient estimate of the cost function with respect to stage lead-times. It is shown that the gradient estimate is unbiased, which ensures that the estimate is accurate when it is used to solve the problem. Finally, a numerical example is given to investigate the performance of the proposed algorithm.
引用
收藏
页码:664 / 668
页数:5
相关论文
共 50 条
  • [31] The minmax due-date assignment problem with acceptable lead-times
    Mosheiov, Gur
    Sarig, Assaf
    ANNALS OF OPERATIONS RESEARCH, 2024, 343 (01) : 401 - 410
  • [32] COMPONENT INVENTORY COSTS IN AN ASSEMBLY PROBLEM WITH UNCERTAIN SUPPLIER LEAD-TIMES
    KUMAR, A
    IIE TRANSACTIONS, 1989, 21 (02) : 112 - 121
  • [33] Planned lead times in multistage systems
    Mohan, RP
    Ritzman, LP
    DECISION SCIENCES, 1998, 29 (01) : 163 - 191
  • [34] OPTIMAL PRODUCTION POLICIES WITH MULTISTAGE STOCHASTIC DEMAND LEAD TIMES
    Kim, Jung-Hyun
    Ahn, Hyun-soo
    Righter, Rhonda
    PROBABILITY IN THE ENGINEERING AND INFORMATIONAL SCIENCES, 2009, 23 (03) : 515 - 543
  • [35] A ROBUST OPTIMIZATION APPROACH FOR PRODUCTION PLANNING UNDER EXOGENOUS PLANNED LEAD TIMES
    Albey, Erinc
    Yanikoglu, Ihsan
    Uzsoy, Reha
    2019 WINTER SIMULATION CONFERENCE (WSC), 2019, : 2312 - 2323
  • [36] Due-Date assignment with acceptable lead-times on parallel machines
    Mor, Baruch
    Mosheiov, Gur
    COMPUTERS & OPERATIONS RESEARCH, 2024, 166
  • [37] Dynamic planned lead times in production planning and control systems: does the lead time syndrome matter?
    Thurer, Matthias
    Fernandes, Nuno O.
    Haeussler, Stefan
    Stevenson, Mark
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2023, 61 (04) : 1268 - 1282
  • [38] Minmax due-date assignment with a time window for acceptable lead-times
    Enrique Gerstl
    Gur Mosheiov
    Annals of Operations Research, 2013, 211 : 167 - 177
  • [39] Transmission Expansion Planning under Uncertainty for Investment Options with Various Lead-Times
    Kim, Wook-Won
    Park, Jong-Keun
    Yoon, Yong-Tae
    Kim, Mun-Kyeom
    ENERGIES, 2018, 11 (09)
  • [40] Minmax due-date assignment with a time window for acceptable lead-times
    Gerstl, Enrique
    Mosheiov, Gur
    ANNALS OF OPERATIONS RESEARCH, 2013, 211 (01) : 167 - 177