An operational model of a reservoir system simulation for real-time flood control in the Han River Basin

被引:4
|
作者
Lee, S. [1 ]
Kang, T. [2 ]
Lee, K. S. [3 ]
机构
[1] Pukyong Natl Univ, Civil Engn, Busan, South Korea
[2] Korea Water Resources Corp, K Water Res Inst, 125 Yuseong Daero 1689 Beon Gil, Daejeon 305730, South Korea
[3] Seoul Natl Univ, Civil & Environm Engn, Seoul, South Korea
来源
JOURNAL OF FLOOD RISK MANAGEMENT | 2017年 / 10卷 / 04期
关键词
Channel capacity; real-time flood control; reservoir balance; reservoir system; MANAGEMENT; ALGORITHM;
D O I
10.1111/jfr3.12159
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
An operational model of a reservoir system simulation was developed for real-time flood control in the Han River Basin, Korea. The developed simulation model jointly operates the four flood control dams. The reservoir system operation model decides or alters a control point and the target river for flood control according to the dam state defined by the two levels of the dam: the maximum forecasted reservoir level and the restricted water level in the flood season. In addition, the model switches the release objectives corresponding to the flood stages, which are normal hydropower release, maximum hydropower release, and spillway release. The reservoir system operation model determines flood releases by reflecting two major concepts: the model pursues reservoir balance at the end of a joint operation and the channel capacity on a downstream control point may limit the release amount from an upstream dam. The application of the model to two historical flood events showed that the channel capacity may limit dam releases and thus may contribute to the reduction of peak discharge on the downstream control point. The model has been operationally used for flood control in the Han River Basin.
引用
收藏
页码:499 / 510
页数:12
相关论文
共 50 条
  • [21] Development of an Optimization/Simulation Model for Real-Time Flood-Control Operation of River-Reservoirs Systems
    Che, Daniel
    Mays, Larry W.
    WATER RESOURCES MANAGEMENT, 2015, 29 (11) : 3987 - 4005
  • [22] Application of an Optimization/Simulation Model for Real-Time Flood-Control Operation of River-Reservoirs Systems
    Che, Daniel
    Mays, Larry W.
    WATER RESOURCES MANAGEMENT, 2017, 31 (07) : 2285 - 2297
  • [23] Development of an Optimization/Simulation Model for Real-Time Flood-Control Operation of River-Reservoirs Systems
    Daniel Che
    Larry W. Mays
    Water Resources Management, 2015, 29 : 3987 - 4005
  • [24] Real-time reservoir flood control operation enhanced by data assimilation
    Zhang, Jingwen
    Cai, Ximing
    Lei, Xiaohui
    Liu, Pan
    Wang, Hao
    JOURNAL OF HYDROLOGY, 2021, 598
  • [25] Improved Risk-Assessment Model for Real-Time Reservoir Flood-Control Operation
    Chen, Juan
    Zhong, Ping-an
    Zhang, Weiguo
    Zhu, Feilin
    Zhang, Yu
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2020, 146 (03)
  • [26] A multi-objective risk management model for real-time flood control optimal operation of a parallel reservoir system
    Chen, Juan
    Zhong, Ping-an
    Liu, Weifeng
    Wan, Xin-Yu
    Yeh, William W-G
    JOURNAL OF HYDROLOGY, 2020, 590
  • [27] A Risk-Based Model for Real-Time Flood Control Operation of a Cascade Reservoir System under Emergency Conditions
    Chen, Juan
    Zhong, Ping-an
    Wang, Man-lin
    Zhu, Fei-lin
    Wan, Xin-yu
    Zhang, Yu
    WATER, 2018, 10 (02):
  • [28] Study on the Flood Real-time Forecasting Correction Model of Luhun Reservoir
    Jia, Huale
    Zhou, Chaofeng
    Zhu, Jie
    PROCEEDINGS OF INTERNATIONAL CONFERENCE ON RESOURCE ENVIRONMENT AND INFORMATION TECHNOLOGY IN 2010 (REIT' 2010), 2010, : 699 - 702
  • [29] Study on real-time flood forecasting system for the Three Gorges Reservoir
    Wang, Chuan-Hai
    Guo, Li-Jun
    Rui, Xiao-Fang
    Kong, Fan-Zhe
    2003, China Water Power Press (14):
  • [30] Operational real-time urban traffic control system
    Boillot, F
    Pierrelee, JC
    Lenoir, F
    Sellam, S
    TRANSPORTATION SYSTEMS 1997, VOLS 1-3, 1997, : 603 - 607