Simultaneous Provision of Flexible Ramping Product and Demand Relief by Interruptible Loads Considering Economic Incentives
被引:12
|
作者:
Hu, Jiahua
论文数: 0引用数: 0
h-index: 0
机构:
Zhejiang Univ, Sch Elect Engn, 38 Zheda Rd, Hangzhou 310027, Zhejiang, Peoples R ChinaZhejiang Univ, Sch Elect Engn, 38 Zheda Rd, Hangzhou 310027, Zhejiang, Peoples R China
Hu, Jiahua
[1
]
Wen, Fushuan
论文数: 0引用数: 0
h-index: 0
机构:
Ton Duc Thang Univ, Dept Management Sci & Technol Dev, Ho Chi Minh City, Vietnam
Ton Duc Thang Univ, Fac Elect & Elect Engn, Ho Chi Minh City, VietnamZhejiang Univ, Sch Elect Engn, 38 Zheda Rd, Hangzhou 310027, Zhejiang, Peoples R China
Wen, Fushuan
[2
,3
]
Wang, Ke
论文数: 0引用数: 0
h-index: 0
机构:
Guangzhou Power Supply Co Ltd, Guangzhou 510620, Guangdong, Peoples R ChinaZhejiang Univ, Sch Elect Engn, 38 Zheda Rd, Hangzhou 310027, Zhejiang, Peoples R China
Wang, Ke
[4
]
Huang, Yuchun
论文数: 0引用数: 0
h-index: 0
机构:
Guangzhou Power Supply Co Ltd, Guangzhou 510620, Guangdong, Peoples R ChinaZhejiang Univ, Sch Elect Engn, 38 Zheda Rd, Hangzhou 310027, Zhejiang, Peoples R China
Huang, Yuchun
[4
]
Salam, Md. Abdus
论文数: 0引用数: 0
h-index: 0
机构:
Ton Duc Thang Univ, Fac Elect & Elect Engn, Ho Chi Minh City, Vietnam
Univ Teknol Brunei, Dept Elect & Elect Engn, BE-1410 Bandar Seri Begawan, BruneiZhejiang Univ, Sch Elect Engn, 38 Zheda Rd, Hangzhou 310027, Zhejiang, Peoples R China
Salam, Md. Abdus
[3
,5
]
机构:
[1] Zhejiang Univ, Sch Elect Engn, 38 Zheda Rd, Hangzhou 310027, Zhejiang, Peoples R China
[2] Ton Duc Thang Univ, Dept Management Sci & Technol Dev, Ho Chi Minh City, Vietnam
[3] Ton Duc Thang Univ, Fac Elect & Elect Engn, Ho Chi Minh City, Vietnam
[4] Guangzhou Power Supply Co Ltd, Guangzhou 510620, Guangdong, Peoples R China
[5] Univ Teknol Brunei, Dept Elect & Elect Engn, BE-1410 Bandar Seri Begawan, Brunei
To cope with the net load variability in real time, sufficient ramp capability from controllable resources is required. To address the issue of insufficient ramp capacity in real time operations, flexible ramping products (FRPs) have been adopted by some Independent System Operators (ISOs) in the USA as a new market design. The inherent variability and uncertainty caused by renewable energy sources (RESs) call for new FRP providers apart from conventional generating units. The so-called interruptible load (IL) has proved to be useful in maintaining the supply-demand balance by providing demand relief and can be a viable FRP provider in practice. Given this background, this work presents a stochastic real-time unit commitment model considering ramp requirement and simultaneous provision of IL for FRP and demand relief. Load serving entities (LSEs) are included in the proposed model and act as mediators between the ISO and multiple ILs. In particular, incentive compatible contracts are designed to encourage customers to reveal their true outage costs. Case studies indicate both the system and LSEs can benefit by employing the proposed method and ILs can gain the highest profits by signing up a favorable contract.
机构:
North China Elect Power Univ, Sch Econ & Management, Beijing 102206, Peoples R ChinaNorth China Elect Power Univ, Sch Econ & Management, Beijing 102206, Peoples R China
Zhang, Yuanyuan
Zhao, Huiru
论文数: 0引用数: 0
h-index: 0
机构:
North China Elect Power Univ, Sch Econ & Management, Beijing 102206, Peoples R ChinaNorth China Elect Power Univ, Sch Econ & Management, Beijing 102206, Peoples R China
Zhao, Huiru
Qi, Ze
论文数: 0引用数: 0
h-index: 0
机构:
North China Elect Power Univ, Sch Econ & Management, Beijing 102206, Peoples R ChinaNorth China Elect Power Univ, Sch Econ & Management, Beijing 102206, Peoples R China
Qi, Ze
Li, Bingkang
论文数: 0引用数: 0
h-index: 0
机构:
North China Elect Power Univ, Dept Econ Management, Baoding 071003, Hebei, Peoples R ChinaNorth China Elect Power Univ, Sch Econ & Management, Beijing 102206, Peoples R China