Simultaneous Provision of Flexible Ramping Product and Demand Relief by Interruptible Loads Considering Economic Incentives

被引:12
|
作者
Hu, Jiahua [1 ]
Wen, Fushuan [2 ,3 ]
Wang, Ke [4 ]
Huang, Yuchun [4 ]
Salam, Md. Abdus [3 ,5 ]
机构
[1] Zhejiang Univ, Sch Elect Engn, 38 Zheda Rd, Hangzhou 310027, Zhejiang, Peoples R China
[2] Ton Duc Thang Univ, Dept Management Sci & Technol Dev, Ho Chi Minh City, Vietnam
[3] Ton Duc Thang Univ, Fac Elect & Elect Engn, Ho Chi Minh City, Vietnam
[4] Guangzhou Power Supply Co Ltd, Guangzhou 510620, Guangdong, Peoples R China
[5] Univ Teknol Brunei, Dept Elect & Elect Engn, BE-1410 Bandar Seri Begawan, Brunei
来源
ENERGIES | 2018年 / 11卷 / 01期
基金
中国国家自然科学基金;
关键词
renewable energy; flexible ramping product (FRP); demand relief; interruptible load (IL); economic incentives; stochastic programming; WIND POWER; UNIT COMMITMENT; GENERATION; FLEXIBILITY; DISPATCH;
D O I
10.3390/en11010046
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
To cope with the net load variability in real time, sufficient ramp capability from controllable resources is required. To address the issue of insufficient ramp capacity in real time operations, flexible ramping products (FRPs) have been adopted by some Independent System Operators (ISOs) in the USA as a new market design. The inherent variability and uncertainty caused by renewable energy sources (RESs) call for new FRP providers apart from conventional generating units. The so-called interruptible load (IL) has proved to be useful in maintaining the supply-demand balance by providing demand relief and can be a viable FRP provider in practice. Given this background, this work presents a stochastic real-time unit commitment model considering ramp requirement and simultaneous provision of IL for FRP and demand relief. Load serving entities (LSEs) are included in the proposed model and act as mediators between the ISO and multiple ILs. In particular, incentive compatible contracts are designed to encourage customers to reveal their true outage costs. Case studies indicate both the system and LSEs can benefit by employing the proposed method and ILs can gain the highest profits by signing up a favorable contract.
引用
收藏
页数:20
相关论文
共 42 条
  • [1] Provision of the Flexible Ramping Product in a microgrid considering the trading strategies in the energy markets
    Bahramara, Salah
    Sheikhahmadi, Pouria
    Mazza, Andrea
    Chicco, Gianfranco
    SUSTAINABLE ENERGY GRIDS & NETWORKS, 2022, 32
  • [2] Low-carbon economic dispatching of energy hub considering flexible ramping product
    Zhu X.
    Luo J.
    Li Z.
    Yao X.
    Liu M.
    Wen H.
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2023, 43 (01): : 9 - 15and24
  • [3] Demand response modeling considering Interruptible/Curtailable loads and capacity market programs
    Aalami, H. A.
    Moghaddam, M. Parsa
    Yousefi, G. R.
    APPLIED ENERGY, 2010, 87 (01) : 243 - 250
  • [4] Unit commitment considering the emergency demand response programs and interruptible/curtailable loads
    Nikoukar, Javad
    TURKISH JOURNAL OF ELECTRICAL ENGINEERING AND COMPUTER SCIENCES, 2018, 26 (02) : 1069 - 1080
  • [5] Stochastic Look-Ahead Economic Dispatch with Flexible Ramping Product
    Zhang, Guangyuan
    McCalley, James
    2015 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, 2015,
  • [6] Deliverable Flexible Ramping Products Considering Spatiotemporal Correlation of Wind Generation and Demand Uncertainties
    Fang, Xin
    Sedzro, Kwami Senam
    Yuan, Haoyu
    Ye, Hongxing
    Hodge, Bri-Mathias
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2020, 35 (04) : 2561 - 2574
  • [7] Electric Vehicle Participated Electricity Market Model Considering Flexible Ramping Product Provisions
    Zhang, Xian
    Hu, Jiefeng
    Wang, Huaizhi
    Wang, Guibin
    Chan, Ka Wing
    Qiu, Jing
    IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2020, 56 (05) : 5868 - 5879
  • [8] Distributionally robust economic dispatch of flexible ramping reserve considering physical boundaries of uncertainty
    Wang H.
    Bie Z.
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2023, 43 (10): : 59 - 68
  • [9] Provision of flexible ramping product by battery energy storage in day-ahead energy and reserve markets
    Hu, Jiahua
    Sarker, Mushfiqur R.
    Wang, Jianhui
    Wen, Fushuan
    Liu, Weijia
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2018, 12 (10) : 2256 - 2264
  • [10] Response health constraints in economic load dispatch considering standby units, interruptible loads and postponable outages
    FotuhiFiruzabad, M
    Billinton, R
    Aboreshaid, S
    IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 1996, 143 (06) : 599 - 607