Study of the Intelligent Completion System for Liaohe Oil Field

被引:5
|
作者
Huang, Zhiqiang [1 ]
Li, Yurong [1 ]
Peng, Yinhua [1 ]
Shen, Zejun [2 ]
Zhang, Weiping [2 ]
Wang, Min [1 ]
机构
[1] SouthWest Petr Univ, Chengdu 610500, Peoples R China
[2] Petr Equipment Dept Res Inst Petr Explorat & Deve, Beijing 100083, Peoples R China
来源
CEIS 2011 | 2011年 / 15卷
关键词
Intelligent well; down-hole monitoring; optimized exploitation; control;
D O I
10.1016/j.proeng.2011.08.138
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The intelligent well technology is one of the most important technologies with the capability of optimizing reservoir management, increasing recoverable reserve, enhancing oil recovery and speeding up the oil exploitation. In order to improve the reservoir development efficiency in our country, reduce water cut in oil well, expand reserve and improve the oil field development benefit, this paper studied the important four sections (the down-hole monitoring system, the data transmission system, the intelligent optimization system on the ground and the production control system), optimized the down-hole gauges and transmission facilities, developed an intelligent optimization system and an inflow control valve (ICV) system with self-owned intellectual property right, and then completed the first set of intelligent completion system(ICS) in China, thus realized a measurable, controllable and optimizable intelligent oil well exploitation. Preliminary experiments have shown the stability and reliability of the system, according to intelligent and advanced exploitation, the oil production of Lei632 oil well has been about 10.5% higher than before. (C) 2011 Published by Elsevier Ltd. Selection and/or peer-review under responsibility of [CEIS 2011]
引用
收藏
页数:8
相关论文
共 50 条
  • [21] Intelligent completion system installed in the Gulf of Mexico
    Jackson, V.B.
    Tips, T.R.
    JPT, Journal of Petroleum Technology, 2001, 52 (10): : 48 - 49
  • [22] Intelligent completion system installed in the Gulf of Mexico
    Jackson, VB
    Tips, TR
    JOURNAL OF PETROLEUM TECHNOLOGY, 2001, 53 (10): : 48 - 49
  • [23] Field test of SAGD as follow-up process to CSS in Liaohe oil field of China
    Yang, L.
    JOURNAL OF CANADIAN PETROLEUM TECHNOLOGY, 2007, 46 (04): : 12 - 15
  • [24] Application of intelligent well completion in optimising oil production from oil rim reservoirs
    Broni–bediako E.
    Fuseini N.I.
    Akoto R.N.A.
    Brantson E.T.
    Advances in Geo-Energy Research, 2019, 3 (04): : 343 - 354
  • [25] Features of sedimentary facies of Dongying formation in Xiaowa area of Liaohe oil field
    Zhou, Qi
    Wang, Xiuyan
    Ding, Wenlong
    Xiao, Lihua
    Daqing Shiyou Xueyuan Xuebao/Journal of Daqing Petroleum Institute, 1999, 23 (04): : 6 - 8
  • [26] Feasibility Study on the Applicability of Intelligent Well Completion
    Sleptsov, Alexander
    Medvedeva, Lyudmila
    Marinina, Oksana
    Savenok, Olga
    PROCESSES, 2024, 12 (08)
  • [27] Subsurface Sludge Sequestration in Cyclic Steam Stimulated Heavy-Oil Reservoir in Liaohe Oil Field
    Zhong, Liguo
    Liu, Jianbin
    Yuan, Xiaonan
    Wang, Cheng
    Teng, Liyong
    Zhang, Shoujun
    Wu, Fei
    Shen, Wenmin
    Jiang, Cheng
    SPE JOURNAL, 2020, 25 (03): : 1113 - 1127
  • [28] Study on Intelligent Monitoring and Controlling System In Oil Drilling Optimization
    Guo, Jian Ming
    Zheng, Wang
    Wang, Yan Ping
    INFORMATION TECHNOLOGY APPLICATIONS IN INDUSTRY, PTS 1-4, 2013, 263-266 : 1319 - 1322
  • [29] Integration of an intelligent completion into an existing subsea production system
    不详
    JOURNAL OF PETROLEUM TECHNOLOGY, 1998, 50 (10): : 34 - 35
  • [30] Research on Ground Control System in Intelligent Completion Technology
    Zhang, Liang
    Li, Ruifeng
    Liu, Jingchao
    Yang, Jianyi
    Ship Building of China, 2019, 60 : 426 - 433