A Comparative Study of Turbulence in Ramp-Up and Ramp-Down Unsteady Flows

被引:27
|
作者
Seddighi, Mehdi [1 ]
He, Shuisheng [1 ]
Orlandi, Paolo [2 ]
Vardy, Alan E. [3 ]
机构
[1] Univ Sheffield, Dept Mech Engn, Sheffield S1 3JD, S Yorkshire, England
[2] Univ Roma La Sapienza, Dipartimento Meccan & Aeronaut, Rome, Italy
[3] Univ Dundee, Div Civil Engn, Dundee DD1 4HN, Scotland
基金
英国工程与自然科学研究理事会;
关键词
Turbulence; Unsteady; DNS; CHANNEL FLOW; PIPE-FLOW; WALL FRICTION; DYNAMICS;
D O I
10.1007/s10494-011-9341-4
中图分类号
O414.1 [热力学];
学科分类号
摘要
DNS of a turbulent channel flow subjected to a step change in pressure gradient are performed to facilitate a direct comparison between ramp-up and ramp-down flows. Strong differences are found between behaviours of turbulence in the two flows. The wall shear stress in the ramp-up flow first overshoots, and then strongly undershoots the quasi-steady value in the initial stage of the excursion, before approaching the quasi-steady value. In a strongly decelerating flow, the wall shear stress tends to first undershoot but then overshoot the quasi-steady value. 'Slow' response of turbulence as well as flow inertia is responsible for these behaviours. In the ramp-up flow, the response of turbulence is similar to that observed in uniformly accelerating flows from previous studies, exhibiting a three-stage development. However, the transition between the various stages is more gradual and the responding stage is much longer and slower in the flows considered here. It has been shown that the delay in the near wall region is longer than that in the buffer layer confirming that turbulence response first occurs at the location of peak turbulence production. In a strongly decelerating flow, the response of turbulence exhibits a two-stage development. In both ramp-up and ramp down flows, the energy distribution in the three components of turbulent kinetic energy deviates from that of the steady flow. In a ramp-up flow, more energy is in upsilon(1) and less in u(2) and u(3,) whereas the trend is reversed in a ramp-down flow. This is a reflection of the redistribution of turbulence from u(1) to u(2) and u(3.)
引用
收藏
页码:439 / 454
页数:16
相关论文
共 50 条
  • [21] Sustainability in Production Ramp-up
    Padrón M.
    Beckschulte S.
    Haller J.
    Elsner J.
    Schmitt R.H.
    ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, 2023, 118 (1-2): : 15 - 19
  • [22] Hismelt Plant Ramp-Up
    Goodman, Neil
    Dry, Rod
    JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL, 2009, 16 : 1228 - 1233
  • [23] A comparative study on production ramp-up: state-of-the-art and new challenges
    Surbier, Laurene
    Alpan, Guelguen
    Blanco, Eric
    PRODUCTION PLANNING & CONTROL, 2014, 25 (15) : 1264 - 1286
  • [24] Ramp-up Journey of New Hires
    Rastogi, Ayushi
    Thummalapenta, Suresh
    Zimmermann, Thomas
    Nagappan, Nachiappan
    Czerwonka, Jacek
    2015 ACM/IEEE INTERNATIONAL SYMPOSIUM ON EMPIRICAL SOFTWARE ENGINEERING AND MEASUREMENT (ESEM), 2015, : 96 - 105
  • [25] Collaborative ramp-up planning and controlling
    Hinrichs, J
    Rittscher, J
    Laakmann, F
    Hellingrath, B
    2004 2ND IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL INFORMATICS: COLLABORATIVE AUTOMATION - ONE KEY FOR INTELLIGENT INDUSTRIAL ENVIRONMENTS, 2004, : 180 - 183
  • [26] Lean Leadership in Production Ramp-Up
    Dombrowski, Uwe
    Wullbrandt, Jonas
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: PRODUCTION MANAGEMENT FOR THE FACTORY OF THE FUTURE, PT I, 2019, : 54 - 61
  • [27] Technical Complaint Feedback to Ramp-Up
    Linder, Alexander
    Anand, Lokesh
    Falk, Bjoern
    Schmitt, Robert
    3RD ICRM 2016 INTERNATIONAL CONFERENCE ON RAMP-UP MANAGEMENT, 2016, 51 : 99 - 104
  • [28] Information enabling production ramp-up
    Fjallstrom, Sabina
    Safsten, Kristina
    Harlin, Ulrika
    Stahre, Johan
    JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT, 2009, 20 (02) : 178 - 196
  • [29] Ramp-up of hybrid manufacturing technologies
    Nau, B.
    Roderburg, A.
    Klocke, F.
    CIRP JOURNAL OF MANUFACTURING SCIENCE AND TECHNOLOGY, 2011, 4 (03) : 313 - 316
  • [30] OEE simulation in production ramp-up
    Fleischer, J
    Lanza, G
    Ender, T
    ISC'2005: 3rd Industrial Simulation Conference 2005, 2005, : 173 - 178