A stochastic model for joint spare parts inventory and planned maintenance optimisation

被引:100
|
作者
Wang, Wenbin [1 ]
机构
[1] Univ Sci & Technol Beijing, Dongling Sch Econ & Management, Beijing, Peoples R China
关键词
Spare parts; Inventory; Maintenance; Delay-time; Dynamic programming; Optimisation; DELAY-TIME ANALYSIS; OF-N SYSTEMS; REPAIR CAPACITY; PROVISIONING POLICY; BLOCK-REPLACEMENT; DEMAND; LEVEL;
D O I
10.1016/j.ejor.2011.07.031
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Spare parts demands are usually generated by the need of maintenance either preventively or at failures. These demands are difficult to predict based on historical data of past spare parts usages, and therefore, the optimal inventory control policy may be also difficult to obtain. However, it is well known that maintenance costs are related to the availability of spare parts and the penalty cost of unavailable spare parts consists of usually the cost of, for example, extended downtime for waiting the spare parts and the emergency expedition cost for acquiring the spare parts. On the other hand, proper planned maintenance intervention can reduce the number of failures and associated costs but its performance also depends on the availability of spare parts. This paper presents the joint optimisation for both the inventory control of the spare parts and the Preventive Maintenance (PM) inspection interval. The decision variables are the order interval, PM interval and order quantity. Because of the random nature of plant failures, stochastic cost models for spare parts inventory and maintenance are derived and an enumeration algorithm with stochastic dynamic programming is employed for finding the joint optimal solutions over a finite time horizon. The delay-time concept developed for inspection modelling is used to construct the probabilities of the number of failures and the number of the defective items identified at a PM epoch, which has not been used in this type of problems before. The inventory model follows a periodic review policy but with the demand governed by the need for spare parts due to maintenance. We demonstrate the developed model using a numerical example. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:127 / 139
页数:13
相关论文
共 50 条
  • [31] Supply reliability-driven joint optimization of maintenance and spare parts inventory in a gas pipeline system
    Fan, Lin
    Su, Huai
    Zio, Enrico
    Li, Yuejun
    Zhang, Li
    Peng, Shiliang
    He, Yuxuan
    Hao, Yucheng
    Zhang, Jinjun
    GAS SCIENCE AND ENGINEERING, 2023, 110
  • [32] Joint Optimization of Preventive Maintenance, Spare Parts Inventory and Transportation Options for Systems of Geographically Distributed Assets
    Wang, Keren
    Djurdjanovic, Dragan
    MACHINES, 2018, 6 (04)
  • [33] Joint optimization of bi-level imperfect maintenance and spare parts inventory considering order quantity
    He, Yong
    Wang, Hong
    Zhao, Xiujie
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2024, 40 (01) : 261 - 276
  • [34] Joint Optimization of Maintenance and Spare Parts Inventory Strategies for Emergency Engineering Equipment Considering Demand Priorities
    Wang, Xiaoyue
    Wang, Jingxuan
    Ning, Ru
    Chen, Xi
    MATHEMATICS, 2023, 11 (17)
  • [35] Joint Block-based Preventive Maintenance and Periodic Review Inventory Policies With Spare Parts Deterioration
    Jiang, Yunpeng
    Chen, Maoyin
    Zhou, Donghua
    2013 25TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2013, : 4826 - 4830
  • [36] Joint optimization of preventive maintenance and inventory management for standby systems with hybrid-deteriorating spare parts
    Zhang, Jian-Xun
    Du, Dang-Bo
    Si, Xiao-Sheng
    Hu, Chang-Hua
    Zhang, Han-Wen
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2021, 214
  • [37] PLANNED STORAGE OF SPARE PARTS
    RENKES, D
    STAHL UND EISEN, 1972, 92 (01): : 22 - &
  • [38] Hybrid optimisation algorithm for solving the multi-level spare parts inventory optimisation problem
    Gu, Tao
    Li, Sujian
    Kou, Zhenzhen
    Wu, Xiuli
    IET COLLABORATIVE INTELLIGENT MANUFACTURING, 2020, 2 (01) : 14 - 21
  • [39] Preventive Maintenance Interval Prediction: a Spare Parts Inventory Cost and Lost Earning Based Model
    Adebimpe, O. A.
    Oladokun, V. O.
    Charles-Owaba, O. E.
    ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2015, 5 (03) : 811 - 817
  • [40] Joint optimisation of spare part inventory, maintenance frequency and repair capacity for k-out-of-N systems
    de Smidt-Destombes, Karin S.
    van der Heijden, Matthieu C.
    van Harten, Aart
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 118 (01) : 260 - 268