Identifying the time of step change and drift in phase II monitoring of autocorrelated logistic regression profiles

被引:5
|
作者
Maleki, M. R. [1 ]
Amiri, A. [1 ]
Taheriyoun, A. R. [2 ]
机构
[1] Shahed Univ, Fac Engn, Dept Ind Engn, POB 18151-159, Tehran, Iran
[2] Shahid Beheshti Univ, Fac Math Sci, Dept Stat, GC, POB 19889-69411, Tehran, Iran
关键词
Within-profile autocorrelation; Step change point; Linear trend disturbance; Binary profile; Phase II; CHANGE-POINT METHOD; BINARY DATA;
D O I
10.24200/sci.2017.4466
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In some profile monitoring applications, the independency assumption of consecutive binary response values within each profile is violated. To the best of our knowledge, estimating the time of a change in the parameters of an autocorrelated binary profile is neglected in the literature. In this paper, two maximum likelihood estimators are proposed to estimate the real time of step changes and drift in Phase II monitoring of binary profiles in the case of within-profile autocorrelation. Our proposed estimators identify the change point not only in the autocorrelated logistic regression parameters, but also in autocorrelation coefficient. The performance of the proposed estimators to identify the time of change points either in regression parameters or autocorrelation coefficient is evaluated through simulation studies. The results, in terms of the accuracy and precision criteria, show the satisfactory performance of the proposed estimators under both step changes and drift. Moreover, a numerical example is given to illustrate the application of the proposed estimators. (C) 2018 Sharif University of Technology. All rights reserved.
引用
收藏
页码:3654 / 3666
页数:13
相关论文
共 50 条
  • [31] Phase II Monitoring of Nonlinear Profiles
    Vaghefi, A.
    Tajbakhsh, Sam D.
    Noorossana, R.
    COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, 2009, 38 (11) : 1834 - 1851
  • [32] Improving Phase I Monitoring of Dirichlet Regression Profiles
    Foroutan, Hourieh
    Amiri, Amirhossein
    Kamranrad, Reza
    INTERNATIONAL JOURNAL OF RELIABILITY QUALITY & SAFETY ENGINEERING, 2018, 25 (06):
  • [33] Sum of Squares Control Charts for Monitoring of Multivariate Multiple Linear Regression Profiles in Phase II
    Ghashghaei, Reza
    Amiri, Amirhossein
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2017, 33 (04) : 767 - 784
  • [34] Detection of the Time of a Step Change in Monitoring Survival Time
    Assareh, Hassan
    Mengersen, Kerrie
    WORLD CONGRESS ON ENGINEERING, WCE 2011, VOL I, 2011, : 314 - 319
  • [36] Identifying the time of a step change in bivariate binomial processes
    Amirhossein Amiri
    Saeed Allahyari
    Fatemeh Sogandi
    The International Journal of Advanced Manufacturing Technology, 2015, 77 : 225 - 233
  • [37] Identifying the time of a step change in bivariate binomial processes
    Amiri, Amirhossein
    Allahyari, Saeed
    Sogandi, Fatemeh
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 77 (1-4): : 225 - 233
  • [38] Identifying the Time of a Step Change with X Control Charts
    Samuel, T. R.
    Pignatiello, J. J.
    Calvin, J. A.
    Quality Engineering, 10 (03):
  • [39] Change-point detection in Phase I for autocorrelated Poisson profiles with random or unbalanced designs
    He, Shuguang
    Song, Lisha
    Shang, Yanfen
    Wang, Zhiqiong
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (14) : 4306 - 4323
  • [40] A two-step logistic regression algorithm for identifying individual-cancer-related genes
    Chen, Bolin
    Shang, Xuequn
    Li, Min
    Wang, Jianxin
    Wu, Fang-Xiang
    PROCEEDINGS 2015 IEEE INTERNATIONAL CONFERENCE ON BIOINFORMATICS AND BIOMEDICINE, 2015, : 195 - 200