Critical ventilation velocity under the blockage of different metro train in a long metro tunnel

被引:17
|
作者
Zhang, Shaogang [1 ]
Shi, Long [2 ]
Li, Xianbin [1 ]
Huang, Yilong [1 ]
He, Kun [3 ]
Wang, Jinhui [1 ]
机构
[1] Shanghai Maritime Univ, Coll Ocean Sci & Engn, Shanghai 201306, Peoples R China
[2] RMIT Univ, Sch Engn, Civil & Infrastruct Engn Discipline, Melbourne, Vic, Australia
[3] Univ Sci & Technol China, State Key Lab Fire Sci, Hefei, Peoples R China
基金
上海市自然科学基金;
关键词
blockage ratio; critical velocity; FDS; metro train; subway tunnel; BACK-LAYERING LENGTH; LONGITUDINAL VENTILATION; NATURAL VENTILATION; BACKLAYERING LENGTH; VEHICULAR BLOCKAGE; SMOKE TEMPERATURE; SUBWAY TUNNEL; FIRE; FLOW; PREDICTION;
D O I
10.1002/fam.2804
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
To address the effect of metro train blockage on the critical ventilation velocity in a long tunnel, a series of scenarios were conducted numerically through this study, including different fire sizes (5-10 MW), metro train lengths (80-120 m), and blockage ratios (phi, 0.50, and 0.57). It is known from the numerical results that the metro train length shows a limited effect on the critical ventilation velocity, which is because the longitudinal ventilation has become stable before reaching the fire source to prevent smoke back-layering, and increasing the metro train length only increases the distance of stabilizing the longitudinal ventilation. The blockage ratio shows an obvious influence on the critical ventilation velocity, which is because the presence of the metro train can obviously reduce the flow cross-sectional area of the tunnel. An empirical model is developed as well, while it is known that the critical ventilation velocity increases with the one-third power of dimensionless heat release rate and (1-phi). The research outcomes of this study provide a technical guide for the design of the metro tunnel and the relevant emergency management of fire rescue under fire conditions.
引用
收藏
页码:497 / 505
页数:9
相关论文
共 50 条
  • [41] Principles adopted for the design of tunnel ventilation and environmental control system in Dehli Metro
    Kumar, S
    Pahuja, DD
    Bakre, A
    10TH INTERNATIONAL SYMPOSIUM ON AERODYNAMICS AND VENTILATION OF VEHICLE TUNNELS: PRINCIPLES, ANALYSIS AND DESIGN, 2000, (43): : 485 - 490
  • [42] The effect of new tunnel construction under existing metro tunnels
    Moss, N. A.
    Bowers, K. H.
    GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 2006, : 151 - +
  • [43] Train rescheduling for a metro circle line: a comparison of different response rules
    Zhou, Yicheng
    Wang, Yihui
    Liebchen, Christian
    Zhu, Songwei
    Li, Bohan
    Zhou, Datian
    TRANSPORTMETRICA B-TRANSPORT DYNAMICS, 2024, 12 (01)
  • [44] Metro Train Autonomous Positioning Using Zero-Velocity Update Based on Train Motion Characteristics
    Zhang, Chunxi
    Lu, Xin
    Yang, Yanqiang
    Wang, Jie
    Tian, Longjie
    IEEE TRANSACTIONS ON VEHICULAR TECHNOLOGY, 2024, 73 (01) : 268 - 281
  • [45] Numerical study on fine dust pollution characteristics under various ventilation time in metro tunnel after blasting
    Xie, Zhuwei
    Xiao, Yimin
    Jiang, Congxin
    Ren, Zhili
    Li, Xueqin
    Yu, Kecheng
    BUILDING AND ENVIRONMENT, 2021, 204
  • [46] Metro train rescheduling by adding backup trains under disrupted scenarios
    Yin, Jiateng
    Wang, Yihui
    Tang, Tao
    Xun, Jing
    Su, Shuai
    FRONTIERS OF ENGINEERING MANAGEMENT, 2017, 4 (04) : 418 - 427
  • [47] Metro train rescheduling by adding backup trains under disrupted scenarios
    Jiateng YIN
    Yihui WANG
    Tao TANG
    Jing XUN
    Shuai SU
    Frontiers of Engineering Management, 2017, (04) : 418 - 427
  • [48] Study on metro train operation adjustment under moving block system
    Lu, Fei
    Song, Mumin
    WCICA 2006: SIXTH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-12, CONFERENCE PROCEEDINGS, 2006, : 446 - +
  • [49] Optimization of emergency ventilation mode for a train on fire stopping beside platform of a metro station
    Hu, Longhua
    Wu, Long
    Lu, Kaihua
    Zhang, Xiaochun
    Liu, Shuai
    Qiu, Zengwei
    BUILDING SIMULATION, 2014, 7 (02) : 137 - 146
  • [50] Metro train rescheduling by adding backup trains under disrupted scenarios
    Jiateng YIN
    Yihui WANG
    Tao TANG
    Jing XUN
    Shuai SU
    Frontiers of Engineering Management, 2017, 4 (04) : 418 - 427