An artificial neural network optimized by a genetic algorithm for real-time flow-shop scheduling

被引:0
|
作者
Abe, M [1 ]
Matsumoto, H [1 ]
Kuroda, C [1 ]
机构
[1] Tokyo Inst Technol, Grad Sch Sci & Engn, Dept Chem Engn, Tokyo 1528552, Japan
关键词
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
A job-shop scheduling method using a three-layered neural network optimized by a generic algorithm, which was called a GANN scheduling method was a flexible and practical quasi-optimal scheduling method. However, further improvements of the present GANN scheduling system are required for rapid flow-shop rescheduling in chemical processes for multipurpose production. In this study we investigated the effect of improvements of the GANN scheduling system on the efficiency of rescheduling when new jobs were appended in a chemical process with some buffer tanks. In results, the former GANN scheduling method could be developed to a practical real-time scheduling system for process problems.
引用
收藏
页码:329 / 332
页数:4
相关论文
共 50 条
  • [41] Artificial neural networks for real-time scheduling
    Nureldin, HM
    O'Connor, RF
    Duffill, AW
    ADVANCES IN MANUFACTURING TECHNOLOGY XII, 1998, : 251 - 256
  • [42] Genetic algorithm approach to job shop scheduling and its use in real-time cases
    Wu, ZM
    Zhao, CW
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2000, 13 (05) : 422 - 429
  • [43] A flexible artificial neural network–fuzzy simulation algorithm for scheduling a flow shop with multiple processors
    Ali Azadeh
    Mohsen Moghaddam
    Pegah Geranmayeh
    Arash Naghavi
    The International Journal of Advanced Manufacturing Technology, 2010, 50 : 699 - 715
  • [44] FLOW-SHOP SCHEDULING WITH MULTIPLE OPERATIONS AND TIME LAGS
    RIEZEBOS, J
    GAALMAN, GJC
    GUPTA, JND
    JOURNAL OF INTELLIGENT MANUFACTURING, 1995, 6 (02) : 105 - 115
  • [45] LINKAGE LEARNING BY BLOCK MINING IN GENETIC ALGORITHM FOR PERMUTATION FLOW-SHOP SCHEDULING PROBLEMS
    Zhang, Zhenzhen
    Chang, Pei-Chann
    Huang, Wei-Hsiu
    Wu, Jheng-Long
    Hsu, Lin
    THIRD INTERNATIONAL CONFERENCE ON COMPUTER ENGINEERING AND TECHNOLOGY (ICCET 2011), 2011, : 203 - +
  • [46] Scheduling a flow-shop problem with fuzzy processing time
    Huang, Chieh-Hung
    Lin, Feng-Tse
    ICIC Express Letters, 2015, 9 (02): : 517 - 524
  • [47] Deep reinforcement learning algorithm for dynamic flow shop real-time scheduling problem
    Yang Y.-Y.
    Hu R.
    Qian B.
    Zhang C.-S.
    Jin H.-P.
    Kongzhi Lilun Yu Yingyong/Control Theory and Applications, 2024, 41 (06): : 1047 - 1055
  • [48] Flow-Shop Scheduling with Transportation Capacity and Time Consideration
    Wang, Chia-Nan
    Porter, Glen Andrew
    Huang, Ching-Chien
    Nguyen, Viet Tinh
    Husain, Syed Tam
    CMC-COMPUTERS MATERIALS & CONTINUA, 2022, 70 (02): : 3031 - 3048
  • [50] An artificial neural network based heuristic for flow shop scheduling problems
    T. Radha Ramanan
    R. Sridharan
    Kulkarni Sarang Shashikant
    A. Noorul Haq
    Journal of Intelligent Manufacturing, 2011, 22 : 279 - 288