Risk-Averse Two-Stage Stochastic Minimum Cost Consensus Models with Asymmetric Adjustment Cost

被引:79
|
作者
Ji, Ying [1 ]
Li, Huanhuan [2 ]
Zhang, Huijie [2 ]
机构
[1] Shanghai Univ, Sch Management, Shanghai 200444, Peoples R China
[2] Univ Shanghai Sci & Technol, Business Sch, Shanghai 200093, Peoples R China
关键词
Two-stage mean-risk stochastic programming; Minimum cost consensus model; Directional constraints; L-shaped algorithm; CONSTRAINT; FEEDBACK;
D O I
10.1007/s10726-021-09752-z
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In the process of reaching consensus, it is necessary to coordinate different views to form a general group opinion. However, there are many uncertain factors in this process, which has brought different degrees of influence in group decision-making. Besides, these uncertain elements bring the risk of loss to the whole process of consensus building. Currently available models not account for these two aspects. To deal with these issues, three different modeling methods for constructing the two-stage mean-risk stochastic minimum cost consensus models (MCCMs) with asymmetric adjustment cost are investigated. Due to the complexity of the resulting models, the L-shaped algorithm is applied to achieve an optimal solution. In addition, a numerical example of a peer-to-peer online lending platform demonstrated the utility of the proposed modeling approach. To verify the result obtained by the L-shaped algorithm, it is compared with the CPLEX solver. Moreover, the comparison results show the accuracy and efficiency of the given method. Sensitivity analyses are undertaken to assess the impact of risk on results. And in the presence of asymmetric cost, the comparisons between the new proposed risk-averse MCCMs and the two-stage stochastic MCCMs and robust consensus models are also given.
引用
收藏
页码:261 / 291
页数:31
相关论文
共 50 条
  • [22] Risk-averse two-stage stochastic programming for the inventory rebalancing of bike-sharing systems
    Walker, Awnalisa
    Kwon, Soongeol
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2024, 31 (02) : 749 - 779
  • [23] Risk-averse two-stage stochastic programming for assembly line reconfiguration with dynamic lot sizes
    Li, Yuchen
    Liu, Ming
    Saldanha-da-Gama, Francisco
    Yang, Zaoli
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2024, 127
  • [24] Quantitative Stability and Empirical Approximation of Risk-Averse Models Induced by Two-Stage Stochastic Programs with Full Random Recourse
    Chen, Zhiping
    Hu, He
    Jiang, Jie
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2021, 38 (04)
  • [25] A Risk-averse Two-stage Stochastic Optimization Model for Water Resources Allocation under Uncertainty
    Xu, Ye
    Li, Sha
    Liu, Feng
    Qian, Jinping
    Cai, Yanpeng
    Cheng, Guanhui
    JOURNAL OF ENVIRONMENTAL ACCOUNTING AND MANAGEMENT, 2018, 6 (01) : 71 - 82
  • [26] Two-stage non-cooperative games with risk-averse players
    Jong-Shi Pang
    Suvrajeet Sen
    Uday V. Shanbhag
    Mathematical Programming, 2017, 165 : 235 - 290
  • [27] Two-Stage Distributionally Robust Minimum Cost Consensus Modeling With Loss Aversion
    Qu, Shaojian
    Zhou, Yingying
    Ji, Ying
    Dai, Zhenhua
    IEEE TRANSACTIONS ON COMPUTATIONAL SOCIAL SYSTEMS, 2024,
  • [28] Two-stage non-cooperative games with risk-averse players
    Pang, Jong-Shi
    Sen, Suvrajeet
    Shanbhag, Uday V.
    MATHEMATICAL PROGRAMMING, 2017, 165 (01) : 235 - 290
  • [29] A risk-averse two-stage stochastic model for optimal participation of hydrogen fuel stations in electricity markets
    Jordehi, A. Rezaee
    Mansouri, Seyed Amir
    Tostado-Veliz, Marcos
    Carrion, Miguel
    Hossain, M. J.
    Jurado, Francisco
    INTERNATIONAL JOURNAL OF HYDROGEN ENERGY, 2024, 49 : 188 - 201
  • [30] Constraint generation for risk averse two-stage stochastic programs
    Minguez, R.
    van Ackooij, W.
    Garcia-Bertrand, R.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 288 (01) : 194 - 206